·
49
·
10.4.3 The test of motor parameters and commissioning
After modify the motor parameters, long-
press the “ON/OFF” button to enter
into testing status of motor parameters, when test succeed, then press
“ENTER” to run, the details as below showed.
Testing...
Test Finish
YES
Start Up?
NO
E
N
T
E
R
Pin
0W
R-Mode MPPT
Iin
0A
Vin
0V
Iaout
0A
Fout 0 .00Hz
Run/Stop
Run
D-Mode
Auto
OF-F
Off
DOWN
Test Finish
YES
Start Up?
NO
Inverter is on automode,
start to autorun
Pin
0W
R-Mode MPPT
Iin
0A
Vin
0V
Iaout
0A
Fout 0 .00Hz
Run/Stop
Stop
D-Mode
Auto
OF-F
Off
Press ON/OFF for 4S
Test Fail
Initialize
Waiting...
Inverter is
power on
firstly
Pin
0W
R-Mode MPPT
Iin
0A
Vin
0V
Iaout
0A
Fout 0 .00Hz
Run/Stop
Stop
D-Mode
Auto
OF-F
Off
ENTER
Please check outwire
connection
If connection is OK,
please switch on PV
combine box
Inverter is on
stopmode.
Please switch off
PV combine box
The test of motor parameters and commissioning sketch figure
Notice!
1.If the test failed, please check whether the inverter output and the motor wiring
connection is in good condition or not, and AC breaker (if has) should be on!
2..After the motor parameters test successfully, then choose “YES” and press “ENTER”
to start up.
3. Press "ON / OFF" for one second, to shut down the inverter.
Notice
:
Motor parameters’ testing must be done again when change pump,
please ensure motor parameters’ reset before re-testing! Re-testing