IV
Should wait for 5 minutes after inverter and PV panel are disconnected,
then inverter only can be touched.
Beware of hot surface
The inverter temperature can exceed 60
℃
during operation. Please don’t
touch the surface to avoid scald.
CE certification marks. It means that inverter complies with the
requirement of CE certification.
Содержание JNP110KH-V3
Страница 1: ...Solar Pumping Inverter User Manual JNP75KH V3 JNP90KH V3 JNP110KH V3 JNP132KH V3 JNP132KH V3 EN V1 0 ...
Страница 22: ...14 Note Photos are for reference only Please adhere to the original products ...
Страница 32: ...24 PE Output load grounding terminal ...
Страница 42: ...34 and Installation Manual for GPRS ...
Страница 53: ...45 8 1 3 LCD Display Interface Overview ...
Страница 64: ...56 Figure8 10 Parameter setting Note Default value of factory password is 00 ...