6 Electrical Connection
The electrical connection can be carried out when the mechanical installation
of inverter is completed. The following operation specification must be followed
when making electrical connection.
Warning
!
●
All the electrical connection must meet local electrical connection
standard.
●
Only qualified electrical personnel can perform the wiring installation
work.
●
Incorrect wiring operation may cause operating casualties or equipment
damage permanently.
●
Ensure that there is no electricity in DC side before the electrical
connection.
●
Grounding correctly, using proper conductor and taking necessary
Short-circuit protection to ensure the safe operation of inverter.
●
Don’t try to close any breaker before all the electrical connection is
finished.
Содержание JNP110KH-V3
Страница 1: ...Solar Pumping Inverter User Manual JNP75KH V3 JNP90KH V3 JNP110KH V3 JNP132KH V3 JNP132KH V3 EN V1 0 ...
Страница 22: ...14 Note Photos are for reference only Please adhere to the original products ...
Страница 32: ...24 PE Output load grounding terminal ...
Страница 42: ...34 and Installation Manual for GPRS ...
Страница 53: ...45 8 1 3 LCD Display Interface Overview ...
Страница 64: ...56 Figure8 10 Parameter setting Note Default value of factory password is 00 ...