SECTION 4 - MACHINE OPERATION
3120883
– JLG Lift –
4-5
4.11 MACHINE LIFTING AND TIE DOWN
Lifting
1.
Call JLG Industries or weigh the individual unit to
obtain GVW.
2.
Place the boom in the stowed position.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
Tie Down
1.
Place the boom in the stowed position.
2.
Remove all loose items from the machine.
3.
Secure the chassis and the platform using straps or
chains of adequate strength.
4.12 BOOM SYNCHRONIZING PROCEDURE
NOTE: If the Lower Boom assembly does not fully lower:
1.
Remove all personnel from the platform.
2.
Pull the red knob located besided the main control
valve.
3.
From Ground Control, activate the lift control switch,
raise Lower Boom 1.8 m (6 feet).
4.
After raising Lower Boom, release the red knob.
5.
Activate Lower Boom Down, fully lower boom.
6.
Repeat step 1 thru 5 if necessary.
Updated 8-4-99
Содержание E45A
Страница 2: ......
Страница 4: ...FOREWORD b JLG Lift 3120883 This page left blank intentionally...
Страница 22: ...SECTION 2 PREPARATION AND INSPECTION 2 6 JLG Lift 3120883 Figure 2 2 Daily Walk Around Inspection Sheet 1 of 3...
Страница 26: ...SECTION 2 PREPARATION AND INSPECTION 2 10 JLG Lift 3120883 Figure 2 3 Lubrication Chart Updated 6 1 99...
Страница 48: ...SECTION 4 MACHINE OPERATION 4 6 JLG Lift 3120883 Figure 4 2 Upright Positioning Updated 8 4 99...
Страница 49: ...SECTION 4 MACHINE OPERATION 3120883 JLG Lift 4 7 Figure 4 3 Lifting Chart Updated 9 21 99...
Страница 50: ...SECTION 4 MACHINE OPERATION 4 8 JLG Lift 3120883 Figure 4 4 Chassis Platform Tie Down Updated 3 15 00...
Страница 52: ...SECTION 5 OPTIONAL EQUIPMENT 5 2 JLG Lift 3120883 This page left blank intentionally...
Страница 56: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 JLG Lift 3120883 Table 7 1 Inspection and Repair Log Date Comments...
Страница 58: ......
Страница 59: ......