-10-
Before the installation, please read the operation instructions of the PV system
carefully. In addition, please completely prepare the site before the installation.
Step 1:Install the rail
Install the rail
Step 2:Install the clamp
Put the clamp into the
rails
Step 3:Install the module
Put the module into the
clamp and tighten the
screw
(
about 16-20N▪m
)
3. Wiring and connection
a) Before this procedure, please read the operation instructions of the PV system
carefully. Make wiring by Multi-connecting cables between the PV modules in
series or parallel connection, which is determined by user’s configuration
requirement for system power, current and voltage.