JinkoSolar

 

Photovoltaic Module-Eagle Dual

Installation Manual

Содержание JKM145PP-36-DV

Страница 1: ...JinkoSolar Photovoltaic Module Eagle Dual Installation Manual ...

Страница 2: ...n safety 2 2 Installation Condition 2 3 Mechanical Installation introduction 2 2 1 Climate condition 2 2 2 Site selection 2 2 3 Tilt angle selection 3 Wiring and connection 4 Maintenance and care 5 Electrical specification Edition 07 2018 4 1 Visual Inspection 4 3 Inspection of Connector and Cable 11 14 6 Disclaimer of Liability 12 4 2 Cleaning ...

Страница 3: ...ed below Group 1 JKMxxxPP 72 DV JKMS xxxPP 72 DV JKMxxxPP 72 DV J JKMSxxxPP 72 DV J xxx 285 350 in steps of 5 72 cells Group 2 JKMxxxPP 60 DV JKMSxxxPP 60 DV JKMxxxPP 60 DV J JKMSxxxPP 60 DV J xxx 240 290 in steps of 5 60 cells Group 3 JKMxxxPP 48 DV JKMSxxxPP 48 DV JKMxxxPP 48 DV J JKMSxxxPP 48 DV J xxx 190 230 in steps of 5 48 cells Group 4 JKMxxxPP 36 DV JKMSxxxPP 36 DV JKMxxxPP 36 DV J JKMSxxx...

Страница 4: ...r a fire resistant roof covering rated for the application Before mounting the module please consult your local building department to determine approved roofing materials The modules are qualified for application class A Hazardous voltage IEC 61730 higher than 50V DC EN 61730 higher than 120V hazardous power applications higher than 240W where general contact access is anticipated Modules qualifi...

Страница 5: ...stall modules where flammable gas may be present Do not touch live terminals with bare hands Use insulated tools for electrical connections Do not remove any part installed by Jinko Solar or disassemble the module All instructions should be read and understood before attempting to install wire operate and maintain the module Don t lift up PV modules using the attached cables or the junction box Al...

Страница 6: ... the module from a vehicle house or hands This will damage module Do not clean the glass with chemicals Only use tap water Make sure the module surface temperature is cool to the touch Cleaning modules with cool water when module surface temp is high may result in glass breakage Do not disconnect any of the modules when under load When looking at PV modules with anti reflection AR coating technolo...

Страница 7: ...unlight regardless if the PV module is connected to or disconnected from the system Do not expose the PV module to excessive loads on the surface of the PV module or twist the frame Do not hit or put excessive load on the glass or rear cover this may break the cells or cause micro cracks During the installation or operation don t use sharp tools to wipe the rear cover and glass Scratches can appea...

Страница 8: ...such loss Do not install the PV module near open flame or flammable materials When solar modules are used to charge batteries the battery must be installed in a manner which will protect the performance of the system and the safety of its users Follow the battery manufacturer s guidelines concerning installation operation and maintenance recommendations In general the battery or battery bank shoul...

Страница 9: ...uate during the rest of the year For grid connected installations where the PV modules are attached to a permanent structure PV modules should be tilted so that the energy production from the PV modules will be maximized on an annual basis 2 3 Mechanical Installation introduction Jinko Eagle Dual modules and Jinko Eagle Bifacial Dual modules usually can be mounted by the clamps Following component...

Страница 10: ...e should be large enough to fix it steadily about 16 20 N m For safety you d better follow the clamps manufacture s recommendation Please find detailed mounting information in the below illustration and we suggest the clamps are mounted between J and K as shown below Type1 Group 1 Group 2 Group 3 Group 4 Mechanical Load Pressure Length Manual direction Front surface 2400 Pa Back surface 2400 Pa 12...

Страница 11: ...uld be between J and K J 300mm K 400mm L 1 2 module length Front surface 5400 Pa Back surface 2400 Pa 150mm Type3 Group 6 Group 8 Mechanical Load Pressure Length Manual direction Front surface 2400 Pa Back surface 2400 Pa 200mm Note The middle of the clamp should be between J and K J 300mm K 400mm Front surface 5400 Pa Back surface 2400 Pa 250mm ...

Страница 12: ...lamp Put the clamp into the rails Step 3 Install the module Put the module into the clamp and tighten the screw about 16 20N m 3 Wiring and connection a Before this procedure please read the operation instructions of the PV system carefully Make wiring by Multi connecting cables between the PV modules in series or parallel connection which is determined by user s configuration requirement for syst...

Страница 13: ...ector capacity must satisfy the maximum short circuit of the PV system for a single component we recommended that the cross sectional area of cables be 4mm2 and the rated current of connectors be more than 10A otherwise cables and connectors will become overheating for large current Please pay attention to the temperature limit of cables is 85 e Follow the requirements of applicable local and nati...

Страница 14: ...asive material under any circumstances c In order to reduce the potential for electrical and thermal shock Jinko recommends cleaning PV modules during early morning or late afternoon hours when solar radiation is low and the modules are cooler especially in regions with hotter temperatures d Never attempt to clean a PV module with broken glass or other signs of exposed wiring as this presents a sh...

Страница 15: ...ht produce more or less voltage or current than rating value in uncertainty condition Accordingly the values of ISC and VOC marked on this module should be multiplied by a factor of 1 25 when determining component voltage ratings conductor current ratings fuse sizes and size of controls connected to the PV output The corresponding electrical specification can be downloaded from website www jinkoso...

Страница 16: ... property or other rights of third parties which may result from use of the PV product No license is granted by implication or otherwise under any intellectual property rights or related use authorization Jinko reserve the right to change the manual the PV produce the specifications or product information Any information may be changed due to business needs technical level or other objective envir...

Страница 17: ...__________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ ...

Страница 18: ...ent Zone Jiangxi Province China 334100 Tel 86 793 858 8188 Fax 86 793 846 1152 Jiangxi Manufacture Base No 58 Yuanxi Road Haining Yuanhua Industrial Park Zhejiang Province China 314416 Tel 86 573 8798 5678 Fax 86 573 8787 1070 Zhejiang Manufacture Base Jinko Building 99 Shouyang Road Jingan District Shanghai China 200027 Tel 86 21 5183 8777 Fax 86 21 5180 8600 ...

Отзывы: