- 12
-
2.3.2.3
Clamp Mounting on Long & Short Sides
Table 6:
Mechanical dimensions of modules installed
with clamps on long
& short
side of frame
Note
:
The installation method of clamps on short sides is based on the internal results in Jinko, not
evaluated by UL.
The installation method of clamps on long and short sides is based on the internal results in
Jinko, not evaluated by UL.
3. Wiring and
C
onnection
a)
Before this procedure, please read the operation instructions of the PV system carefully.
Connect the PV module connections in series or parallel, which is determined by the
user‟s
configuration requirement for system power, current and voltage.
b)
PV modules connected in series should have similar current, and modules must not be
connected together to create a voltage higher than the permitted system voltage. The
maximum number of modules in series depends on system design, the type of inverter
and
environmental conditions.
Module
type
Dimension
(mm)
Max. Test Pressure: 2400Pa
(positive) &
2400Pa (negative)
mechanical load
A*B
J
K
M
N
Group 1
Group 3
1650*992 & 1665*1002
50
240
400
420
Group 7
Group 9
1650*992 &1665*1002
50
240
400
420
Group 4
Group 6
1956*992 & 1979*1002 50 240 400 480
Group 10
Group 12
1956*992 & 1979*1002 50 240 400 480
Group 2
1665*992 & 1684*1002 50
240
400
420
Group 5
1665*992 & 1684*1002 50 240 400 420
Group 8
1987*992 & 2000*992
& 2008*1002
50
240
400
480
Group 11
1987*992 & 2000*992
& 2008*1002
50 240 400 480
Group13
Group 15
2031*1008
50
240
400
480
Group14
Group 16
1704*1008
50 240 400 480
Figure 7:
Installation of clamps on long
& short side of frame