This document is only for internal use of JINNENG CLEAN ENERGY TECHNOLOGY LTD, and shall not be published or
copied without permission of the company.
Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6
S/N
Operating Procedure
Control Point
1
Cut off the straps, remove the top package down and hold on flat
floor
,
as shown in figure 1.
2
Cut the two longitudinal straps, then carefully cut and remove
the cardboard of one short side of the box, as shown in figure 2.
For the safety of operation,
operators
should
wear
anti-cutting gloves and other
labor protection supplies
;
Pay
attention to not damage the
modules
during
the
cutting
process.
3
Cut and remove the inner transverse security straps around the
modules, then remove the wooden support inside the box
,
as
shown in figure 3.
4
Cut the cardboard, then cut the inner straps around the
modules, as showed in figure 4.
5
Pull slowly out the modules from the back side of the module,
then carry one module with two people
,
as showed in figure 5.
When take off the last eight modules, the outermost module
must be slanted to lean on the other modules (If not may result
in hidden cracks or damage when the module tilted).
6
Package could be put on the place that the tilt angle is not more
than 17 degrees. When unpacking on non-horizontal place,
measures should be needed to protect modules, as showed in
fgure 6.
Note
If there are modules left after unpacking, please lay them flat
and repack them.
For details on the storage of scattered components, see the
following page.
3. Suitable for 182 single glass modules
Figure 1 Figure 2 Figure 3 Figure 4 Figure 5
S/N
Operating Procedure
Control Point