12
MAINTENANCE,
CONTINUED
JH INDUSTIRES INC.
FIGURE #11—
Maintenance Bars
4. Disconnect power source and follow OSHA
electrical lock-out/ tag-out to prevent lift
operation.
5. Once all work is complete, reconnect the power
source and remove the lock-out/ tag-out. Let
your supervisor know that the lift has power
before raising.
6. Raise the dock lift to it’s full raised position.
7. Remove the maintenance bars from the dock lift
and secure in designated storage area.
8. See Prestart in the OPERATION section of this
manual. Do all inspections as specified.
9. Lower the lift to its stored position.
Routine periodic maintenance should be performed
per FIGURE #10. Failure to do so could result in
damage, premature failure or wear of the dock lift.
Install
maintenance bars
in both sides
Push up against
wall as shown
Push forward
between base wall
and support tab
Every (1) Month or 50 Hrs. of
use (whichever comes first)
•
Verify you have the most up to date Manual, visit www.copperloy.com
•
Visually inspect the entire lift.
•
Verify that all welds are structural sound and free from damage or cracks.
•
Check all pins and bearings for excessive wear or damage.
(See Figure #11)
•
Inspect the structure of the lift for any damage or wear.
•
Inspect the level of the hydraulic fluid, fill as necessary using the correct oil
(See
Figure #12).
•
Inspect for hydraulic leaks or damaged hydraulic components.
•
Visually inspect the safety chain, verify nothing is missing and there is no damage.
•
Verify all safety labels are legible and installed
(See Figure # )
Every (6) Months or 500 Hrs. of
use (whichever comes first)
•
Clean hinges on bridge, wash or blow out with compressed air. Lubricate as
needed by applying grease between hinge spools.
•
Touch up paint as necessary to prevent rust (Contact JH Industries, Inc. for paint
color)
•
Check all hydraulic fittings and hoses, fittings can become loose from the
vibrations of the power unit and use.
•
Check all bolts and nuts make sure they are tight and have not become loose.
•
Replace the hydraulic fluid, see maintenance instructions in Maintenance Section.
•
Inspect the rollers at the end of the scissor arms for excess wear or damage.
(See
Figure #11)
FIGURE #12
—Routine Periodic Maintenance Schedule
CAUTION
!
Содержание Copperloy
Страница 2: ......
Страница 22: ...20 WARNING LABELS JH INDUSTIRES INC 1 2 3 5 4 7 ...
Страница 25: ...23 STANDARD PARTS LIST JH INDUSTIRES INC ...
Страница 26: ...36 JH INDUSTIRES INC NOTES ...
Страница 27: ...37 JH INDUSTIRES INC NOTES ...