26
Operation Technical Manual
A
A
B
C
INSTALLING THE HEAD FASTENERS
1.
Insert the two fasteners (A) into the holes
indicated in the figure on the side.
2.
Secure the fasteners with the nuts (B) and
washers (C) (figure on the side).
B
=
hex nut 7/16” with nylon lock (02 un)
C
= flat washer Ø12 x Ø29 x 4.76 (02 un)
NOTE!
The screws, nuts and washers are located in the
kit supplied with the head.
Содержание 1000 AT
Страница 2: ......
Страница 39: ...JF 1000 AT 39 TABLA DE TORQUE PARA TORNILLO ROSCA MÉTRICA Unidad de torque N m ...
Страница 40: ...40 Manual de Instrucciones TABLA DE TORQUE PARA TORNILLO ROSCA PULGADA Unidad de torque N m ...
Страница 41: ...JF 1000 AT 41 TABLA DE MEDIDA DE LLAVES ...
Страница 42: ...42 Manual de Instrucciones ...
Страница 44: ...44 Manual de Instrucciones ...
Страница 45: ...JF 1000 AT 45 ...
Страница 83: ...JF 1000 AT 39 TORQUE CHART FOR METRIC THREAD SCREW Torque unit N m ...
Страница 84: ...40 Operation Technical Manual TORQUE CHART FOR INCH THREAD SCREW Torque unit N m ...
Страница 85: ...JF 1000 AT 41 KEY GAUGE TABLE ...
Страница 86: ...42 Operation Technical Manual ...
Страница 88: ...44 Operation Technical Manual ...
Страница 89: ...JF 1000 AT 45 ...
Страница 91: ......