________________________________________________________________________________________________
29
8. Put part 3 (the cable)
through the cable gland
in this way:
Remove 90 mm of the
insulation from the cable.
Mount 4 mm cable shoes
at the earth cable.
Mount cable shoes at the
phases.
9. Remove the nut from the
gland.
Put the cable through the
nut and the gland.
10. The heating elements of
the junction box must be
star-connected.
Mount the three phases
at the threaded pin sec-
tion without splices.
Mount the earth wire at
the earthing bar.