11
7. Blower operations
1. Verify adjustable push force
Verify adjustable push force is set to the established crash test value and the speed are at minimum. Turn
the pressure setting valve to 0 bar by lifting the dial ring and turn it fully anti clockwise.
2. Engage belt drive
The belt drive can be operated in forward. For installation, engage the belt
drive in forward by slowly increasing the air pressure valve. Install the cable into the
duct using push only until the installation has slowed.
Do not exceed 6 bars.
When
exceeding 3 bars consider to stop the cable jetting as you might dismantle the
cable at motor pressure > 3 bars.
3. Engage air
Slowly open the air control valve to allow air flow to the air block. Do not apply
maximum air pressure and flow at initial air engagement. Do not open air supply
before adequate cable has been pushed in (> 100M).
IMPORTANT
Do not exceed 16 bars when operating the unit.
Forced air creates flying debris.
Always wear personal protective equipment.
4. Adjust speed
Use the pressure setting dial to adjust the belt drive speed to ensure smooth installation and match the
amount of air pressure being used so that the forces are working together, not against one another.
5. Install cable
It may be helpful to guide/apply back tension to the cable using your hand at the cable entrance of the
machine to maintain control over the cable.
6. Belt drive engages forward
To stop the belt drive reduce the pressure or turn the red emergency shut off valve in the off direction.
7. Check water separator
Check/empty the water separator regular to secure that no water will go into the motors.