
Jetter AG
Electrical connection | 6
JCM-631 User Manual
26 / 78
6.2 Commissioning
This chapter outlines the steps for initial commissioning of this device.
DANGER
Uncontrolled axis movements
High mechanical forces due to axis movements and accelerations.
►
Keep out of the danger zone of the machine.
►
Do not disable any safety equipment.
►
Have malfunctions eliminated by qualified personnel.
NOTICE
Surges resulting from missing protection or fusing
Surges may cause malfunctions or damage to the product.
►
Protect the voltage inputs from surges according to the requirements.
►
Ensure that the device is handled in accordance with ESD regulations.
6.2.1 Connecting the voltage supply
Follow the steps below to connect the power supply:
ü
Make sure that the enabling relay is connected and jumpered.
1.
Connect the following pins:
Power supply
Terminating resistor of 120 Ω at the beginning and end of the CAN bus
2.
Switch on the ignition.
ð
The controller is supplied with power.
6.2.2 Booting up the controller
ü
You need the cable with the designation Programming Cable
2m M12/8-pin/
X-coded to RJ45 (part no. 60880135)
1.
Connect the cable to the
service connector 2
.
2.
Connect controller and PC by means of the Ethernet cable.
3.
Power-up the controller.
ð
The controller goes through the boot process.
ð
LED
D1
flashes green when the controller is ready for operation.
4.
Establish a network connection between your PC and the controller. The de-
fault IP address of the controller is
192.168.10.15.
5.
Launch the JetSym programming tool.
ð
Now, you can start configuring the controller.
INFO
Further information
For more information on this topic refer to the Online Help in our software prod-
ucts or to the application-oriented manuals on our