background image

© 2018 Jetta Corporation. All rights reserved. REV 03/2018

 

WWW.JETTACORP.COM

 

1(800) 288-7771

 

INSTALLATION INSTRUCTIONS | JETTA CORPORATION 

PAGE | 13 

WALK-IN INSTALLATION INSTRUCTIONS 

TESTING: 

Water test your unit prior to installation. Set the tub on a level surface where it can be drained after testing. Fill to the overflow. Make 
sure all fittings, through walls and piping are water tight. While each unit is checked at the factory, the process of shipping or improper 
handling may have loosened the joints. If there are leaks, mark the spot(s), drain and repair with GE Silicone Sealer (fiber glass to PVC) 
or PVC cement (PVC to PVC). Repeat test when dry. 

The air switch must be located on or near bath, with access available. Check to ensure that the air hose is plugged into the switch that 

is located at the back of the rectangular box on top of the motor. For additional safety, a ground-fault circuit-interrupter must be 
added. 

Faucets may be installed through the wall or mounted on the bath. Insert drain and overflow to waste line. After installation, fill the 
bath and let stand 3 - 4 hours (operating it for at least 30 minutes) to double check that it is still water tight. Inspect tub completely 
(around pump and or blower, all plumbing fittings and doors for leaks) any defect must be reported prior to installation in order to have 
it covered under warranty. 

Check to ensure that your installation will conform to all applicable codes and secure necessary permits. All electrical and plumbing 
connections should be made by qualified electricians and plumbers. 

LEVELING INSTRUCTIONS: 

1.

Feet are extended for shipping purposes to provide clearance and protection of the front skirt. The tub must be reset to proper
installation height by installer.

2.

Raise the two center feet so that tub rests only on the four corner feet.

3.

Raise the corner feet to lower tub to desired height and level tub in both directions.

4.

After the tub has been water tested and all plumbing connections are made up, verify tub level and lock the four corner feet in
position.

5.

Lower the two center feet so they firmly contact the floor and tighten in place.

SYSTEM TEST: AFTER INSTALLATION  MAKE SURE ALL PLUMBING CONNECTIONS AND HYDRO MASSAGE AND AIR 
MASSAGE SYSTEM CONNECTIONS ARE CORRECTLY INSTALLED, RUN THE FOLLOWING TESTS: 

1.

Before filling the tub with water, be sure to remove all loose debris from tub. Wipe down the door seal using a damp cloth, as
well as the surface in the door jamb that will come in contact with the door seal.

2.

Fill the tub to the overflow and check for leaks. Check by hand where visual verification is not possible.

3.

Turn the pump and or blower on and let run for at least 30 minutes. Check for leaks while the system/systems are running
and again after you turn them off. Check by hand where visual verification is not possible.

U-BAR INSTALLATION INSTRUCTIONS

For ease of access, mount the Grab Bar prior to Walk-In Tub placement.

Using the accompanying hardware, slide the Chrome decorative ring onto the bolts on the Grab Bar.

Mount the Grab Bar into the predrilled holes on the deck of the tub.

Under the deck, slide the washers onto the Grab Bar bolts and tighten the Grab Bar using the provided nuts.

NOTE: DO NOT OVER TIGHTEN 

as this may cause damage to the tub surface.

 Not using washers at install may cause injury

due to failure of the grab bar.

 

Содержание RAIN SHOWER BASES

Страница 1: ...FOR ALL LINES AND MODELS ADVANTAGE RAIN SHOWER BASES CLASSIC DESIGNER ELITE AFFINITY COSMO WALK IN 800 288 7771 WWW JETTACORP COM Installation Instructions...

Страница 2: ......

Страница 3: ...PREPARATIONS 6 ROUGH IN 6 INSTALLATION STEPS 6 FREESTANDING INSTALLATION INSTRUCTIONS 8 ROUGH IN 8 PREPARATIONS 8 INSTALLATION OF FREESTANDING BATHTUBS 1 PIECE AND DRAIN 9 INSTALLATION OF FREESTANDING...

Страница 4: ...duseasdescribedinthe Owner sManual Onlyuseattachmentsrecommendedbythemanufacturer 3 Do not insert any object into any opening Do not operate electrical appliances while in or within 5 feet of the bath...

Страница 5: ...manufacturers facility and is factory tested and should not be removed or altered under any circumstances Removal or alteration of this pigtail will void the warranty The green lead of the pigtail is...

Страница 6: ...uring that uniform support is given to all areas of the base and that no portion of the lip is bearing weight DO NOT SUPPORT THE WEIGHT OF THE BATH BY THE RIM Your Jetta bath has a pre leveled lip tha...

Страница 7: ...will fit snugly in place Slide the notched top edge of the skirt under the lip of the tub Move the bottom section of the skirt in place until it is resting against the wood blocks Verify the vertical...

Страница 8: ...r Jetta bath should be installed in a bedding compound of mortar mix or thin set which should be distributed under the base to provide maximum support and even weight distribution Do not use foam sand...

Страница 9: ...pended by its lip 9 Connect the bath drain to the drain pipe Position a protective liner in the bath basin 10 Drill small holes through the flange at the studs If there are gaps fill them with a shim...

Страница 10: ...leted by a licensed plumber before the bathtub is moved into its final position PROTECTIVE FOAM PACKAGING The adjustable feet are protected with foam packaging around each foot to ensure the quality o...

Страница 11: ...t staples to avoid damaging the surface of the bathtub 5 Temporarily install the drain assembly of the bathtub 6 Place the bathtub back into position on the previously traced outline while ensuring th...

Страница 12: ...the bathtub drain and overflow see figure below Make sure that there are no obstructions in this space A 2 Remove only the bathtub being careful to not move the skirt Next draw the interior outline of...

Страница 13: ...up with the hole on the back of the leg and ensure that it will fit properly The bracket can be adjusted slightly if needed 5 When you ve made sure the bracket is in the proper position for the instal...

Страница 14: ...refer to the installation guide provided with the door All plumbing rough in for both the drain and the supply should be completed before installing the shower base INSTALLATION STEPS Ensure walls and...

Страница 15: ...1 Feet are extended for shipping purposes to provide clearance and protection of the front skirt The tub must be reset to proper installation height by installer 2 Raise the two center feet so that t...

Страница 16: ...not overtighten Make sure the O rings on the pump are in place Hand tighten pump fittings Do not use a wrench channel locks or pipe dope Teflon paste 4 The Filler Extension panel s are used to extend...

Страница 17: ...for cleaning To remove the jets turn the outer ring counter clockwise past the point of resistance until you hear a click Pull the jet straight out to remove To reinstall the jet insert the jet body...

Страница 18: ...sure that the lines stay clean and dry What should I do if the light in my air tub will not turn on The light on air or combo tubs is operated by the keypad Check to ensure that the gray cable coming...

Страница 19: ...PAGE 15 2018 Jetta Corporation All rights reserved REV 03 2018 WWW JETTACORP COM 1 800 288 7771 INSTALLATION INSTRUCTIONS JETTA CORPORATION...

Страница 20: ...WWW JETTACORP COM 425 Centennial Blvd Edmond OK 73013 LOCAL 405 340 6661 TOLL FREE 405 340 6661 SALES JETTACORP COM...

Отзывы: