background image

GENERAL GUIDE FOR SET-UP OF NOVA MV 
SYSTEM. 
 

1). Bleed all air from gas lines. 
2). With the main burner functioning, adjust the inlet pressure regulator to supply gas to 
the appliance within the design parameters of the appliance manufacturer. 
3). Make certain that the thermocouple and thermo-generator are fully inserted and 
tightened into their receptacles in the pilot head. The thermocouple should be threaded 
into the valve hand-tight, plus ¼ turn with a wrench. 
4). Verify that the system is wired properly, and that all connections are clean and tight. 
Thermo-generator leads are connected to the TPTH and TP connections of the main 
operator. Thermostat and wall switch wires are connected to the TPTH, and TH terminals 
of the valve. 
5). Turn OFF/PILOT/ON knob to the PILOT position and depress knob, while lighting 
the pilot with a match or piezo ignitor. 
6). Continue to hold the knob down until enough current is generated to engage the safety 
magnet.(Mill-Volt Plus systems use a thermocouple to power the safety magnet, Millivolt 
systems utilise power from the thermo-generator). 
7). After the pilot has been lit for approximately three minutes , and only the thermo-
generator wires connected to the main operator head, measure the voltage across TPTH 
and TP. This open circuit voltage should be between 500mV and 750mv. Tune the pilot 
adjustment screw until the mV reading falls within these parameters. (Counter clockwise 
increases the mV reading, clockwise decreases) 
8).With the pilot adjusted properly, place a jumper wire between TPTH and TH. Take 
mV reading  across the TPTH and TP terminals on the valve. This closed circuit voltage 
should remain above 300mV. 
9).Remove jumper wire from the TPTH and TH connections, and re-connect the 
thermostat and wall switch wire to the same terminals. Take the closed circuit voltage as 
described in the previous step. This closed circuit should remain above 175mV. 
10). Rotate OFF/PILOT/ON knob to the ON position. Main burner will light. 
11).Verify operation of the thermostat and wall switch by cycling each individually, 
while observing the main burner operation. 
12). Rotate the OFF/PILOT/ON knob to the OFF position. Both the pilot and main burner 
will be extinguished. 

Содержание Mark 2 Gas Coal

Страница 1: ...Installation instructions Jetmaster Mark 2 Gas Coal Pebble with Millivolt Control...

Страница 2: ...imney should be tested and proven to have an adequate updraft which shall be sufficient to remove all waste products of combustion A minimum cross sectional area of 40 000 sq mm is required with a min...

Страница 3: ...ol knob on right hand side of valve Depress and turn control knob FIG 1 to the PILOT position FIG 4 Depress the control button and ignite with piezo ignitor FIG 2 whilst keeping control knob firmly de...

Страница 4: ...HOW TO ADJUST GAS PRESSURE...

Страница 5: ...of coals in a honeycomb pattern to form an elongated pyramid Lay the coals pebbles so that some irregularity to the pile through which the flames may lick is created Your aim is to build windows into...

Страница 6: ...which has been designed to ensure a proper draw and to eliminate emission spillage 2 Initially the Jetmaster coal pebble fire may burn with a slightly blue flame After approximately 20 minutes the fir...

Страница 7: ...existing masonry fireplace or equivalent approved open fireplace The gas fire consists of an outer decorative grate which houses a mild steel burner tray A front plate is provided to cover controls CA...

Страница 8: ...s welded onto a 4 5mm guage mild steel frame to provide the appearance of a solid fuel basket grate A 1 6mm guage folded mild steel tray is located within the basket grate It is welded to the back of...

Страница 9: ...located under the burner tray Burner A folded mild steel tray with deflector plate A cast iron venturi tapered mixing tube is welded to the base through which gas is introduced Pilot S I T Pilot asse...

Страница 10: ...For LPG the appliance regulator requires removal Note pressures on data plate for natural and LP gas and adjust accordingly The test point is located on the SIT valve HEATING SYSTEM Vermiculite Is var...

Страница 11: ...the safety magnet Millivolt systems utilise power from the thermo generator 7 After the pilot has been lit for approximately three minutes and only the thermo generator wires connected to the main ope...

Страница 12: ...ure with main burner running see diagram Pilot adjustment screw not properly adjusted Refer to item 7 in the set up guide also see diagram Thermocouple or thermo generator not properly inserted into t...

Страница 13: ...and TP If the voltage is above 110mV and the safety magnet does not hold replace the valve Pilot injector blocked Replace injector with a new injector of the exact size and type Pilot drops out Wrong...

Страница 14: ...at wiring except substitute the words wall switch where the word thermostat appears in the instructions Excessive wire resistance Make certain that all mV connections are made using wire of the proper...

Страница 15: ...Notes For further information contact Jetmaster Australia 10 Martin Avenue Arncliffe NSW 2205 T 02 9597 7222 F 02 9597 7622 E sales jetmaster com au W www jetmaster com au...

Отзывы: