Installation
Unpacking the Machine
Do not handle the packed
machine using slings.
To install the machine, first remove the packing,
paying particular attention not to cut any electric
wires or hydraulic hoses. Lift using straps
(Figure 3).
Figure 3
Anchoring and Handling the Machine
The base of the machine must be anchored to
the floor by two lag bolts or studs properly
anchored into concrete.
Electrical Connections
All electrical connections
must be done by a qualified
electrician. All adjustments or repairs must
be done with the machine disconnected from
the power source, unplugged. Failure to
comply may result in serious injury!
J-CK350-2
is rated at
220V
.
J-CK350-4
is rated at
440V
.
These machines not supplied with a plug. Use a
plug and outlet rated at least 20amps. The
circuit for the machine should also be protected
by at least a 20 amp circuit breaker or fuse.
Make sure that the blade turns in the correct
direction.
If it does not, simply reverse two of
the phase wires on the supply input.
The sawing machine is now ready for use.
Controls
Control Panel
The
Control Panel
(Figure 4) is located on the
front the cabinet stand and consists of the
Power
and
High/Stop/Low
switches, described
below.
Power Switch
– The
Power
switch has two
positions,
Off
and
On.
High/Stop/Low Switch
– This switch controls
the blade speed. To operate the saw, the power
switch must set to on,
High
or
Low
must be
selected
and
the
Run Trigger
depressed.
Figure 4
Trigger Handle
To operate, the
Power
switch must be set to
on
a
Hi
or
Low
speed selection made, and the
trigger handle, depressed.
Figure 5
Содержание J-CK350-2
Страница 17: ...17 Stand Assembly...
Страница 19: ...19 Head Assembly...
Страница 21: ...21 Base Assembly...
Страница 23: ...23 Manual Vise Assembly...
Страница 25: ...25 Guard Assembly file 03...
Страница 27: ...27 CK350 Mist Coolant Assembly file 04...
Страница 31: ...31 Wiring Diagram...
Страница 32: ...32 WMH TOOL GROUP Inc 427 New Sanford Road LaVergne Tennessee 30786 Ph 800 274 6848 www wmhtoolgroup com...