background image

6

JTJ-2SV 2-Ton Toe Jack

Содержание JTJ-2SV

Страница 1: ...ER S MANUAL JTJ 2SV 5SV 10SV Toe Jack JET EQUIPMENT TOOLS INC P O BOX 1349 Phone 253 351 6000 A WMH Company Auburn WA 98071 1349 Fax 1 800 274 6840 www jettools com e mail jet jettools com M 453505 04...

Страница 2: ...intenance JET LIMITS ALL IMPLIED WARRANTIES TO THE PERIOD SPECIFIED ABOVE FROM THE DATE THE PRODUCT WAS PURCHASED AT RETAIL EXCEPT AS STATED HEREIN ANY IMPLIED WARRANTIES OR MECHANTABILITY AND FITNESS...

Страница 3: ...ompletely when finished using the jack An extended ram might get damaged Do not lower a load suddenly and stop in the middle of a lift Damage to the jack may occur Replace the warning label on the jac...

Страница 4: ...to open the valve WARNING Slowly turn the release valve Turning the release valve quickly makes the load fall rapidly and may lead to the loss off the load or damage to the jack Failure to comply may...

Страница 5: ...6 Push the ram down completely 7 Push the filler plug sideways to let the trapped air bleed out Troubleshooting Problem Cause Solution Release stem is open Close release stem completely Toe will not e...

Страница 6: ...6 JTJ 2SV 2 Ton Toe Jack...

Страница 7: ...1 19 JTJ2SV 19 Ram Packing 1 20 JTJ2SV 20 Ram Guide Ring 1 21 JTJ2SV 21 Snap Ring 1 22 JTJ2SV 22 Stuffing Ring 1 23 JTJ2SV 23 Cylinder Packing 1 24 JTJ2SV 24 Stopper Ring 1 25 JTJ2SV 25 Ram Guide Ring...

Страница 8: ...8 JTJ 5SV 5 Ton Toe Jack...

Страница 9: ...Ram Packing Seat 1 18 H10018 Ram Backup Ring 1 19 H10019 Ram Packing 1 20 H 920 0031 Ram Guide Ring 1 21 H10021 Snap Ring 1 22 H 920 0026 Stuffing Ring 1 23 H10023 Cylinder Packing 1 24 H10024 Stopper...

Страница 10: ...10 JTJ 10SV 10 Ton Toe Jack...

Страница 11: ...19 Ram Packing 1 20 H 920 0034 Ram Guide Ring 1 21 H20021 Snap Ring 1 22 H 280 0525 Stuffing Ring 1 23 H20023 Cylinder Packing 1 24 H 280 525 Stopper Ring 1 28 H10028 Oil Plug 1 29 H20029 Horizontal P...

Отзывы: