background image

                                                                                      ULTRA POWER TWIN II-30      P/N 39-941705 
                                                                                      ULTRA POWER TWIN II-22      P/N 39-941707 

REV

 

12/2013

 

APPLICATION

 

The

 

primary

 

purpose

 

of

 

your

 

Power

 

Twin

 

II

 

is

 

to

 

provide

 

rock

 

solid

 

stabilization

 

for

 

maximum

 

comfort

 

while

 

using

 

your

 

RV

 

in

 

a

 

parked

 

position.

   

To

 

obtain

 

this

 

desired

 

end

 

result

 

and

 

eliminate

 

the

 

possibility

 

of

 

damage

 

to

 

your

 

RV

 

or

 

the

 

Power

 

Twin

 

II,

 

it

 

is

 

very

 

important

 

to

 

follow

 

these

 

step

by

step

 

instructions.

 

IMPORTANT:

   

DO

 

NOT

 

OPERATE

 

THE

 

POWER

 

TWIN

 

II

 

BEFORE

 

READING

 

THE

 

OPERATING

 

INSTRUCTIONS.

 

The

 

Power

 

Twin

 

II

 

will

 

assist

 

you

 

in

 

final

 

lifting

 

and

 

leveling,

 

based

 

on

 

the

 

Power

 

Twin

 

II

 

Power

 

Curve

 

Graph

 

which

 

shows

 

pounds

 

of

 

lift

 

in

 

relation

 

to

 

the

 

ground

 

clearance

 

from

 

the

 

bottom

 

of

 

the

 

frame.

 

By

 

measuring

 

the

 

ground

 

clearance

 

on

 

your

 

RV

 

you

 

can

 

determine

 

the

 

maximum

 

amount

 

of

 

lift

 

your

 

Power

 

Twin

 

II

 

will

 

provide

 

for

 

final

 

leveling.

   

NOTE:

   

THE

 

POUNDS

 

OF

 

LIFT

 

INCREASES

 

AS

 

THE

 

DISTANCE,

 

FROM

 

GROUND

 

TO

 

FRAME,

 

INCREASES.

 

SAFETY

 

AND

 

DAMAGE

 

WARNING

 

CAUTION:

 

ALWAYS

 

FOLLOW

 

THESE

 

INSTALLATION

 

AND

 

OPERATING

 

INSTRUCTIONS

 

TO

 

PREVENT

 

DAMAGE

 

TO

 

YOUR

 

RV

 

AND

 

TO

 

PREVENT

 

PERSONAL

 

INJURY.

 

INSTALLATION

 

The

 

Power

 

Twin

 

II

30

 

does

 

not

 

come

 

assembled.

   

Please

 

follow

 

all

 

of

 

the

 

steps

 

of

 

these

 

instructions.

   

The

 

Power

 

Twin

 

II

22

 

is

 

pre

assembled,

 

so

 

please

 

skip

 

to

 

Step

 

3.

 

❶   

Attach

 

mounting

 

plate

 

(#2)

 

to

 

main

 

assembly

         

channel

 

(#1)

 

using

 

four

 

(4)

 

M8

1.25x25mm

 

carriage

 

bolts

 

(#14)

 

and

 

four

 

(4)

 

M8x1.25

 

NYLOCK

 

nuts

 

(#15).

 

Make

 

sure

 

the

 

mounting

 

plate

 

is

 

square

 

to

 

the

 

main

 

channel

 

assembly

 

before

 

tightening

 

the

 

nuts.

 

❷   

Attach

 

the

 

two

 

(2)

 

arm

 

support

 

braces

 

(#13)

 

to

 

the

 

mounting

 

plate

 

(#2)

 

using

 

two

 

(2)

 

M12

1.75x30mm

 

hex

 

head

 

bolts

 

(#16)

 

and

 

two

 

(2)

 

M12x1.75

 

NYLOCK

 

nuts

 

(#17).

     

Place

 

the

 

plastic

 

washer

 

(#11)

 

between

 

the

 

arm

 

and

 

the

 

mounting

 

bracket.

   

Attach

 

the

 

other

 

end

 

of

 

the

 

arm

 

support

 

braces

 

to

 

the

 

leg

 

assembly

 

(#8)

 

using

 

one

 

(1)

 

M12

1.75x100mm

 

hex

 

head

 

bolt

 

(#18)

 

and

 

one

 

(1)

 

M12x1.75

 

NYLOCK

 

nut

 

(#17)

 

by

 

placing

 

the

 

leg

 

spacer

 

(#10)

 

inside

 

the

 

leg

 

assembly

 

and

 

pushing

 

the

 

bolt

 

through

 

the

 

one

 

side

 

of

 

the

 

leg,

 

through

 

the

 

spacer

 

and

 

out

 

of

 

the

 

other

 

side

 

of

 

the

 

leg

 

channel.

     

Be

 

sure

 

to

 

place

 

the

 

plastic

 

washer

 

(#11)

 

between

 

the

 

arm

 

and

 

the

 

leg

 

brace

 

before

 

pushing

 

the

 

bolt

 

through

 

the

 

hole.

   

Tighten

 

all

 

bolts

 

and

 

nuts

 

until

 

snug.

   

Do

 

not

 

over

 

tighten

 

as

 

these

 

are

 

pivot

 

points.

     

REPEAT

 

steps

 

1

 

and

 

2

 

for

 

the

 

second

 

leg

 

assembly

 

(39

841700

 

PTII

30).

 

INSTALLATION/OPERATION

 

Содержание ULTRA POWER TWIN II-30

Страница 1: ...AND TO PREVENT PERSONAL INJURY INSTALLATION The Power Twin II 30 does not come assembled Please follow all of the steps of these instructions The Power Twin II 22 is pre assembled so please skip to Step 3 Attach mounting plate 2 to main assembly channel 1 using four 4 M8 1 25x25mm carriage bolts 14 and four 4 M8x1 25 NYLOCK nuts 15 Make sure the mounting plate is square to the main channel assembl...

Страница 2: ...of the motor and gear box assemblies 22 to the Power Twin II with the four 4 M6 1 0x110mm hex bolts 24 making sure the gasket 27 is between the motor cover and the gear box NOTE Make sure that the wires come out of the bottom side of the motor cover towards the ground when installed REPEAT this step for the second motor and gear box assembly The switches may be mounted at any desired location but ...

Страница 3: ... determine which side of our RV is the lowest and extend the jack s on that side until your RV is level Extend the jack s on the opposite side of the RV until they touch the ground firmly Your RV is now in its most stable position You can retract all of the jacks simultaneously CLASS C MOTOR HOMES Set your brakes Extend the jack on the low side of your Class C motor home until the rear is level Ex...

Страница 4: ...ULTRA POWER TWIN II 30 P N 39 941705 ULTRA POWER TWIN II 22 P N 39 941707 REV 12 2013 ...

Страница 5: ...tion by anyone other than the Manufacturer or its authorized representative 4 In order to obtain the benefits of this Warranty you should return the product which you find defective to the Manufacturer named below during the period that this Warranty is in effect All charges incurred in delivery of the product to the Manufacturer and in picking it up after the Warranty service has been completed m...

Отзывы: