NOTICE!
Signal cables must not be laid parallel to high-voltage current lines or mains cables. Lay supply and signal
lines in separate channels. An angle of 90° is required at line crossings. If signal lines are longer than 2 m,
shielded cables must be used.
ATTENTION!
To avoid premature wear of the gear, always ensure the correct rotation direction of the motor: counter-
clockwise (to the left), looking toward the fan wheel.
7.4.1 Drive motor connection
IMPORTANT!
Note the data on the motor rating plate
Connection
MEMDOS
Phases Motor
supplier
Note
W2
U2
V2
U1
V1
W1
L1
L2
L3
PE
E 4...156,
E 160...380
3~
All
Y-connection (Standard)
W2
U2
V2
U1
V1
W1
L1
L2
L3
PE
E 4...156,
E 160...380
3~
All
Delta connection
MEMDOS E three-phase motors
Connection
MEMDOS
Phases Motor
supplier
Note
Z1
TB2
U2
U1
Z2
TB1
L
N
PE
CB
E 4...156
1~
ATB
U1
Z1
U2
PE
C
1 2 3 4 5
T1 L
N
T2
Z2
E 4...156
1~
EMG
230 V AC
or 120 V AC (CSA)
Installation | Operation & Maintenance Instructions |
19
Содержание MEMDOS E
Страница 50: ...Notes 50 Operation Maintenance Instructions Notes...
Страница 51: ...Notes Notes Operation Maintenance Instructions 51...
Страница 52: ......