![Jesco MEMDOS E Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/jesco/memdos-e/memdos-e_operation-manual_3808984029.webp)
10. Shutdown
Before starting any maintenance or before long downtimes, drain the chemical from the dosing pump and
rinse it thoroughly with a neutral medium.
CAUTION!
Excess chemical must be disposed properly. Follow the applicable accident prevention regulations, and wear
personal protective equipment.
Protective clothing
Protective gloves
Protective goggles
CAUTION!
The dosing pump must be disconnected from the power supply and secured to prevent it being restarted.
CAUTION!
Before disconnecting the discharge line from the pump discharge valve, release the pressure so that chemi-
cal does not spray out.
To drain the dosing head, it is advisable to unscrew the discharge and suction valves.
10.1 Disposal of old equipment
If the equipment is being disposed of, it should be washed thoroughly. Residual chemicals should be dis-
posed of properly. The equipment was manufactured in accordance with the ROHS guideline and the waste
electrical equipment legislation. The manufacturer will take care of disposal if the equipment is returned free
of charge. It should not be disposed of as domestic waste!
Device revision
This operation manual applies to following devices:
Device
Revision
MEMDOS E
8/2001
MEMDOS DX
8/2001
It contains all the technical information required for installation, start-up and maintenance. Should you have
any questions or require further information regarding this operataion manual, please contact the manufac-
turer or their official national representative.
Außerbetriebnahme | Operation & Maintenance Instructions |
29
Содержание MEMDOS E
Страница 50: ...Notes 50 Operation Maintenance Instructions Notes...
Страница 51: ...Notes Notes Operation Maintenance Instructions 51...
Страница 52: ......