background image

10

GB

GB

GB

GB

GB

Set jumper on printed circuit board to position 1 (if not default).

Attach neutral conductor to terminal 1, power supply (230 V AC) to terminal 2 and
attach control current (230 V AC) to terminal 3.

If no controlling voltage is available, terminals 2 and 3 must be jumped.

NOTICE!
Power supply on terminal 2 and control current terminal 3 must be in phase!

Potentiometer P1 is used for gross adjustment of rotor speed (revolutions) and
thus the rate of delivery. Potentiometer P2 is used for the fine adjustment of the
rotor speed (about 10% of the range of P1). If the control current at terminal 3
(„In1“) is active, the pump discharges with the rate of delivery corresponding to the
settings of P1 and P2.

On terminal 11 and 12 a suction line with float switch for supply tank empty
detection may be installed. If a supply tank empty is detected, the signal LED L3
blinks. Terminals 5 (neutral conductor) and 6 (phase) lead operation voltage to
switch on an external visual or audible warning signal. An optional LED in series
with a resistor (560 Ohm) between terminals 9 and 10 may be added.

NOTICE!
If no suction pipe with float switch is installed, terminals 11 and 12 must be
jumped!

With active control voltage on terminal 4 („In2“) terminals 5 (neutral) and 6
(phase) are active (230V AC) and an optional LED in series with a resistor (560
Ohms) between terminals 9 and 10 is on. This special mode is intended to gather
the error-state of any device of a more-device-dosage-station to the last device,
which gives the error-state to a computer system or additional external warning
signal.

Mode of operation 2 (one or two time relays)

Set jumper on printed circuit board to position 2 (default is position 1)

Attach neutral conductor to terminal 1 and power supply (230 V AC) to terminal 2.

Attach control voltage 1 (230 V AC) to terminal 3 and control voltage 2 (230 V AC)
to terminal 4.

NOTICE!
Control voltages (terminals 3 and 4) and operational voltage (terminal 2) must
be cophasal!

With potentiometer P1 a time period between 6 and 60 seconds (selector switch
SW in position 1) or between 60 and 600 seconds (selector switch SW in position
2)can be set.

With a control voltage (230 V AC) at terminal 3 the pump delivers corresponding
to the adjusted operation time with constant rotor speed (delivery rate of about 6
ml/min).

NOTICE!

NOTICE!

NOTICE!

Содержание EASYDOS Peristaltic V

Страница 1: ...nance Instruction Maintenance Instruction Maintenance Instruction Maintenance Instruction Maintenance Instruction Read these operation maintenance instructions before start up To be held for future re...

Страница 2: ...f operation 9 Mode of operation 1 adjustable rate of delivery 9 Mode of operation 2 one or two time relays 10 Mode of operation 3 1 time relay with adjustable rate of delivery on channel 1 12 Mode of...

Страница 3: ...azardous situation Non compliance can lead to death or serious injury CAUTION Refers to a potentially hazardous situation Non compliance can lead to minor injury or property damage NOTICE Appears in c...

Страница 4: ...1 Potentiometer P1q Q Potentiometer P2 Error signal L3 case fixing screw 6 Table with jumper positions Pump housing 7 Rotor Pump tube Inner electronic cover 10 Cover of electronic removed End splices...

Страница 5: ...table between 7 ml h and 400 ml h due to the high torque capabilities of the DC motor applicable even for smallest capacities against pressure of up to 2 bar 29 psig or 10 m 32 8 ft water column or vi...

Страница 6: ...level of the barrel or supply tank containing the product Pump must be installed vertically with tube connections facing downward CAUTION The pump must not be used for inflammable products When pumpi...

Страница 7: ...rminal block arrangement in the upper part of the installation housing Fasten union nut of the threaded cable gland A high IP Protection class is only achieved in this way Place device on installation...

Страница 8: ...re on the right side If another mode of operation is required pull jumper upwards with a forceps and put it onto the pin couple that corresponds to the desired mode of operation Mode of operation 1 ad...

Страница 9: ...inals 9 and 10 may be added NOTICE If no suction pipe with float switch is installed terminals 11 and 12 must be jumped With active control voltage on terminal 4 In2 terminals 5 neutral and 6 phase ar...

Страница 10: ...he warning signal are designated A jumper must be set that the pin marked with B and the pin in the middle are connected In this operation mode the operation time is started with an impulse that last...

Страница 11: ...ect selection selector switch SW in position 2 can be set With potentiometer P2 the rotor speed may be adjusted to a rate of delivery between 0 1 and 2 ml min With a control voltage 230 V AC at termin...

Страница 12: ...ter P2 the rotor speed can be set to operate at a rate of delivery between 0 1 and 2 ml min As long as the control current 230 V AC at terminal 4 is active the pump operates at the adjusted rate of de...

Страница 13: ...which can be done during normal service NOTICE Before installing the EASYDOS Perestaltic V the chemical compatibility of the tube and the process fluid has to be evaluated The life span of the pump t...

Страница 14: ...ys disconnected from the power supply while exchanging the tube switch off power supply of the chemical feed system The pump housing is a wearing part and must be changed after reasonable periods of t...

Страница 15: ...his declaration loses its validity Product description Perestaltic Pump Model designation EASYDOS Peristaltic V Relevant EC regulations EC Low Voltage Directive 73 23 EEC EC Electromagnetic Compatibil...

Страница 16: ...g Yes No Corrosive Yes No We hereby certify that the product has been cleaned thoroughly inside and outside before returning that it is free from hazardous material i e chemical biological toxic flamm...

Страница 17: ...ical fault p Premature wear p Connections plug connectors or cables loose p Wear parts p Operating elements e g switches push buttons p Breakage other damage p Electronic unit p Corrosion p Damage in...

Страница 18: ......

Страница 19: ......

Страница 20: ...180 497516 E Mail info lutz jesco nl Internet www lutz jesco nl USA Lutz JESCO America Corp 55 Bermar Park Rochester N Y 14624 USA Phone 1 585 426 0990 Fax 1 585 426 4025 E Mail mail jescoamerica com...

Отзывы: