11
Step 12
:
Connect the electrical system.
Attention: electrical connection must be done by a licensed electrician.
Connect the wiring as per the wiring diagram and do pay careful attention to the number tubes attached on each thread of wire.
Wires of with the same number shall be connected.
Step 13: Mounting of top and bottom stop
When top and bottom stops are mounted in the main post, it is important that they are mounted correctly as otherwise they can
break when the lift is tested. See picture below how to place them in the main post. Also remember to adjust the arm on the top
and bottom stops.
Bottom stop
Top stop
Step 14: Leveling
No vehicle on platforms when leveling.
Switch on and press the UP button when the green power indicating light is on. When the steel cable has been tightened,
measure if the two platforms are of the same height from the ground. If not, adjust the tightening screw fixed on top of the main
post.
Step14: Fix the expansion plug.
Содержание JA5500F
Страница 19: ...19 Annex2 Overall diagram...
Страница 20: ...20 Annex3 Floor plan Annex 4 Steel cable connection...
Страница 22: ...22 Annex 6 Wiring diagram Three phase...
Страница 23: ...23 Electric wire connections in control box Picture of the control box and connections...
Страница 24: ...24...
Страница 25: ...25...
Страница 26: ...26...
Страница 27: ...27 Annex7 Separate diagrams for the lift JA5500F...
Страница 35: ...35 Annex9 Size and weight requirements on vehicles...
Страница 36: ...36...