23/102
BILGE PUMP SYSTEM
ELECTRIC BILGE PUMP
You can energize the electric bilge pump from the electrical panel.
The pump starts automatically thanks to a release mechanism situated in the sump area.
Operation:
The electric bilge pumps are connected to the 12V service circuit. To enable operation the 12V
circuit must be activated by turning on the battery switches.
Capacity: 32 litre / minute.
MANUAL BILGE PUMP
The manual bilge pump is in the cockpit.
The control arm of the pump shall be kept accessible whatever the circumstances.
Capacity: 40,5 litre / minute.
WARNING
The bilge pump system is not designed to provide buoyancy to the boat in case
of damage.
The bilge pump system is designed to drive out the water being either sea spray
or leaks but absolutely not the water coming through a hole in the hull, this hole
being the result of a damage.
- Do not let the pumps run while dry, this may cause them damage.
- The water in the bilge shall be kept at its minimum.
- Check the functioning of each bilge pump regularly.
SAFETY PRECAUTIONS
- Clean off debris which could block the pump intake points or strainers. If the watertight
partitions which seal off the fore and aft points are fitted with valves they must be closed
at all times and only opened to drain water into the main bilge.
2
S
A
F
E
T
Y
Содержание SUN FAST 3200
Страница 1: ...SUN FAST 3200 OWNER S MANUAL COURSE CROISI RE 087862 Index F...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 13: ...9 102 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS CERTIFICATION CONSTRUCTION YOUR BOAT 1...
Страница 18: ......
Страница 28: ...24 102 BILGE PUMP SYSTEM A Electric bilge pump B Filter C Manual bilge pump...
Страница 29: ...25 102 HULL MAINTENANCE OF THE HULL LIFTING 3...
Страница 32: ......
Страница 39: ...35 102 STEERING SYSTEM STEERING GEAR 5...
Страница 40: ...36 102 STEERING GEAR 704 56 690 56 111 43 505 00 467 08 50 72 82 00 19...
Страница 42: ......
Страница 43: ...39 102 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES 6...
Страница 47: ...43 102 6 Nable Fuel RIGGING AND SAILS...
Страница 50: ...46 102 RUNNING RIGGING BACKSTAY Rope designation Number 1 Backstay 1 2 Backstay adjustment 1...
Страница 51: ...47 102 6 Nable Fuel 24 1 12 1 6 1 RIGGING AND SAILS...
Страница 57: ...53 102 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Страница 58: ...54 102 INTRODUCTION...
Страница 61: ...57 102 WATER AND SEWAGE WATER WATER TANK WATER SYSTEM DISTRIBUTION WATER SYSTEM DRAINAGE SEWAGE 8...
Страница 62: ......
Страница 67: ...63 102 DRAINAGE HEAD VERSION 8 WATER AND SEWAGE WATER...
Страница 68: ......
Страница 72: ......
Страница 73: ...69 102 GAS GAS SYSTEM 9...
Страница 75: ...71 102 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 24 V DC SYSTEM 10...
Страница 76: ...72 102 ELECTRICAL LAYOUT 1 Battery switch Positive 2 Battery switch Negative terminal...
Страница 80: ...76 102 12 24 V DC WIRING DIAGRAM...
Страница 81: ...77 102 10 ELECTRICAL EQUIPMENT...
Страница 85: ...81 102 ENGINE GENERAL INFORMATION ENGINE FITTING MAINTENANCE 11...
Страница 96: ......
Страница 97: ...93 102 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 12...
Страница 98: ...94 102 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Страница 101: ...97 102 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 13...
Страница 104: ......
Страница 106: ......