33/102
HEAVING UP THE ANCHOR
- Heave up slowly on the anchor, with engine.
- Heave the anchor completely.
- While sailing stow the anchor away.
STERN ANCHORING
Stern anchoring shall be performed with the engine declutched.
- Secure the required length of cablet on the mooring cleat.
- Pay out the anchor line slowly.
- Take care not to damage the propeller or the rudder.
MAINTENANCE
WARNING
Windlass operations are dangerous:
- Always keep the anchor line unfouled and free.
- Always proceed with care, using gloves and always wearing shoes.
ADVICE - RECOMMENDATION
Rinse the mooring line with fresh water after each trip.
4
DECK
Содержание SUN FAST 3200
Страница 1: ...SUN FAST 3200 OWNER S MANUAL COURSE CROISI RE 087862 Index F...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 13: ...9 102 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS CERTIFICATION CONSTRUCTION YOUR BOAT 1...
Страница 18: ......
Страница 28: ...24 102 BILGE PUMP SYSTEM A Electric bilge pump B Filter C Manual bilge pump...
Страница 29: ...25 102 HULL MAINTENANCE OF THE HULL LIFTING 3...
Страница 32: ......
Страница 39: ...35 102 STEERING SYSTEM STEERING GEAR 5...
Страница 40: ...36 102 STEERING GEAR 704 56 690 56 111 43 505 00 467 08 50 72 82 00 19...
Страница 42: ......
Страница 43: ...39 102 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES 6...
Страница 47: ...43 102 6 Nable Fuel RIGGING AND SAILS...
Страница 50: ...46 102 RUNNING RIGGING BACKSTAY Rope designation Number 1 Backstay 1 2 Backstay adjustment 1...
Страница 51: ...47 102 6 Nable Fuel 24 1 12 1 6 1 RIGGING AND SAILS...
Страница 57: ...53 102 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Страница 58: ...54 102 INTRODUCTION...
Страница 61: ...57 102 WATER AND SEWAGE WATER WATER TANK WATER SYSTEM DISTRIBUTION WATER SYSTEM DRAINAGE SEWAGE 8...
Страница 62: ......
Страница 67: ...63 102 DRAINAGE HEAD VERSION 8 WATER AND SEWAGE WATER...
Страница 68: ......
Страница 72: ......
Страница 73: ...69 102 GAS GAS SYSTEM 9...
Страница 75: ...71 102 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 24 V DC SYSTEM 10...
Страница 76: ...72 102 ELECTRICAL LAYOUT 1 Battery switch Positive 2 Battery switch Negative terminal...
Страница 80: ...76 102 12 24 V DC WIRING DIAGRAM...
Страница 81: ...77 102 10 ELECTRICAL EQUIPMENT...
Страница 85: ...81 102 ENGINE GENERAL INFORMATION ENGINE FITTING MAINTENANCE 11...
Страница 96: ......
Страница 97: ...93 102 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 12...
Страница 98: ...94 102 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Страница 101: ...97 102 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 13...
Страница 104: ......
Страница 106: ......