- 106 -
15.4 LAUNCH/LIFT OUT
The initial commissioning of your boat will require a lot of skill and care. The proper working of
all your boat's equipment is the result of the quality of the commissioning operations. This is
why the initial launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Check the anodes (see the chapter on Electricity).
- Check the propeller (see the chapter on Steering).
- Prepare enough fenders and lines.
- Check the opening of the fuel supply tap (see the chapter on motorisation).
-
Towing ring
(used only for towing purposes)
Do not remain onboard or beneath the boat during the handling operations.
- When placing the slings make sure that the positioning marks are still
visible.
- Submerge the sling fully under the engine mounting.
Содержание MERRY FISHER 695 MARLIN
Страница 1: ...MERRY FISHER 695 MARLIN OWNER S MANUAL 981522 Index C...
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 18: ......
Страница 24: ...24 Diagram of the layout Navigation lights...
Страница 34: ...34 Diagram of the layout Drying out the bilge...
Страница 36: ......
Страница 48: ...48 Layout diagram DC circuit...
Страница 50: ...50 7 2 5 Layout of the wiring looms in the hull DC circuit...
Страница 60: ......
Страница 62: ...62 10 3 FILLING CIRCUIT FRESH WATER DISTRIBUTION...
Страница 76: ......
Страница 88: ......
Страница 102: ...102 14 4 SALOON TABLE...
Страница 105: ...105 15 3 UPPER LIMIT OF ANTIFOUL Note Measurements are expressed in mm 15 HANDLING TRANSPORT...
Страница 110: ......
Страница 114: ...114...
Страница 115: ...115 17 APPENDIXES...
Страница 116: ......