
- 29 -
992092
Index B
5.4.2 Drainage system
General points
- The inner moulding of the hull has channelling: the drainage channels. The drainage
channels allow the water to drain down to the lowest point in the boat, where it can be
discharged. So it is important to allow the water to flow freely down to this lowest point of the
boat, which includes.
- Regularly cleaning the lowest point of the boat and the drainage channels.
Diagram of the layout - Bilge pumps
Reference
Designation
Rate
1
Manual bilge pump
32p/minute
(*)
2
Manual bilge pump lever
3 & 3’
Electric bilge pump
30p/minute
4
Switch - Forward electrical bilge pump
4’
Switch - Aft electric bilge pump
(*) 45 strokes/minute
If 70 stroke/minute: rate 35p/minute
5
S
A
F
E
T
Y
Содержание CAP CAMARAT 7.5 CC serie 2
Страница 1: ...992092 Index B CAP CAMARAT 7 5 CC OWNER S MANUAL ...
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 16: ......
Страница 20: ......
Страница 24: ......
Страница 34: ......
Страница 46: ... 46 992092 Index B 7 2 4 1 DC electrical schematic diagram 12 V ...
Страница 56: ... 56 992092 Index B Water tank Location Cockpit locker Capacity 80 litre WATER filler ...
Страница 68: ......
Страница 90: ... 90 992092 Index B 12 2 2 Rod holder 12 2 3 Seat cockpit 12 2 4 Pilot seat ...
Страница 96: ......
Страница 100: ......
Страница 103: ... 103 992092 Index B 14 3 UPPER LIMIT OF ANTIFOUL Note Measurements are expressed in mm 14 HANDLING TRANSPORT ...
Страница 108: ......
Страница 112: ... 112 992092 Index B ...