June, 2014
Part No. 960-100932R_Rev. A
© 2014, JCM American, Corporation
Part No. 960-100932R_Rev. A
© 2014, JCM American, Corporation
1 0
7
GENERAL (6 MONTHS/72,000 CYCLES)
1. Reassemble the iVIZION Validator Head and the Transport Unit, so that the
iVIZION Unit is fully assembled.
2. Using the JCM Tool Suite application, initialize the iVIZION Statistics.
3. If a repair, calibration or firmware change is not required, then the iVIZION
Cleaning and Preventive Maintenance procedure is complete. The iVIZION Unit
may be returned to service.
NOTE: Initialization resets the performance numbers to Zero (0) and stores
the date from the PC on the iVIZION Unit for future reference.
Figure 7
iVIZION Unit and Cash Box
Typical iVIZION Unit
(fully assembled)
6 MONTHS OR 72,000 CYCLES
Every 6 Months or 72,000 Cycles, the following procedures should be per-
formed in a Service Area (approximate time for completion: 10-15 Minutes):
INSPECTION
1. Using JCM Tool Suite, check the Statistics for information on performance.
Be sure to note the three most common Error Codes for Banknotes and Tickets.
During the Maintenance Procedure, check areas of the iVIZION Validator that
might generate the noted Error Codes.
2. Perform a visual inspection of the entire iVIZION Unit (Validator Head and
Transport Unit). Look for any broken or damaged parts that need to be repaired
or replaced.
Table 2
6 Months or 72,000 Cycles
Component
Procedure Description (Details follow this table)
Inspection
Inspect for damaged or broken parts - repair or replace as
required.
Inspection
Inspect Belts for wear or damage in the Validator Head and
Transport Unit - Repair or replace as required.
Inspection
Inspect Optical Sensor Lenses for damage in the Validator
Head, Transport Unit and Cash Box - Replace Lenses if
scratched, cracked, discolored or damaged.
General
Complete the monthly cleaning procedure (refer to Page 3).
Validator Head
Clean the Validator Head Rollers (refer to
Figure 5
-
iVIZION Validator Head (Blue Area).
Validator Head
Clean the Validator Head Belts (refer to
Figure 5
- iVIZION
Validator Head (Orange Area).
Transport
Clean the Transport Rollers (refer to
Figure 6
- iVIZION
Transport Unit (Blue Area).
Transport
Clean the Transport Belts (refer to
Figure 6
- iVIZION
Transport Unit (Orange Area).
Run the Acceptance Test and verify proper operation.
NOTE: Refer to Appendix A in the iVIZION Operation and Maintenance
Manual (JCM P/N 960-100929R) for Error Codes.