P/N 960-100929R_Rev. 7 {EDP #148849}
© 2017, JAPAN CASH MACHINE CO., LTD.
2 - 1 7
Installation
iVIZION® Series Next-Generation Banknote Acceptor Unit
Section 2
Operational Flowcharts
Figure 2-19 depicts a typical iVIZION SS/LD Banknote acceptance flow process (Initialization).
Figure 2-19
iVIZION SS/LD Banknote Acceptor
Operational Flowchart (Initializing)
a) Initializing
b) Enter Stand-by Mode
c) Enable Accept?
d) LED Display Extinguished
e) LED Display shows Enable Light
f) Is Banknote inserted?
g) Feed Banknote In
h) Banknote Transporting
i) Banknote Data Sampling
j) Stop Transporting Banknote
A) To Validation Process
(See Figure 2-20 for SS Unit
and Figure 2-21 for LD Unit).
C) Stand-by return from Figure 2-20
and Figure 2-21.
a
b
e
c
f
g
h
i
j
d
Power ON
NO
YES
NO
YES
C
A
Figure 2-19
iVIZION SS/LD Banknote Acceptor Operational Flowchart (Initializing)