
Operation
Working with the Machine
126
126
9811/9950-1
Lifting With the Excavator
!M
WARNING
You must turn on the overload warning system before
you use the excavator for object handling, or a
stability hazard could occur.
8-2-8-20
Lifting operations must be carried out with the overload
warning system turned ON,
Note: Use a signalman when lifting with the excavator.
Make sure you both understand and use the recognized
signals. Keep all persons clear of the load and machine
while the load is on the excavator.
1
A bucket should be fitted when lifting with the
excavator to prevent the link swinging. Check that the
load is not greater than the safe working load for the
bucket.
T033970-2
Fig 57.
2
The correct JCB lifting shackle
A
must be fitted. The
bucket ram must be fully extended as at
B
. If your
machine is not fitted with this equipment there will be
A
B
C
HE Services
Содержание 8026 CTS
Страница 2: ...0 0 9811 9950 Notes E S e r v i c e s...
Страница 23: ...Introduction Machine Description 5 5 9811 9950 1 C031400 B1 Fig 2 ZTS 8 0 3 0 1 3 2 4 7 6 5 8 E S e r v i c e s...
Страница 62: ...Introduction Machine Security 44 44 9811 9950 1 Page left intentionally blank E S e r v i c e s...
Страница 68: ...Operation Entering and Leaving the Cab 50 50 9811 9950 1 Fig 8 B A E S e r v i c e s...
Страница 71: ...Operation Doors and Windows 53 53 9811 9950 1 C035100 Fig 11 E S e r v i c e s...
Страница 99: ...Operation Operating Levers Pedals 81 81 9811 9950 1 Page left intentionally blank E S e r v i c e s...
Страница 101: ...Operation Operating Levers Pedals 83 83 9811 9950 1 C035010 3 Fig 34 SAE h 1 A B E S e r v i c e s...
Страница 103: ...Operation Operating Levers Pedals 85 85 9811 9950 1 731911 Fig 36 F E S e r v i c e s...
Страница 105: ...Operation Operating Levers Pedals 87 87 9811 9950 1 731911 Fig 38 F E S e r v i c e s...
Страница 107: ...Operation Operating Levers Pedals 89 89 9811 9950 1 796300 B3 Fig 40 A B A B D E S e r v i c e s...
Страница 109: ...Operation Operating Levers Pedals 91 91 9811 9950 1 C019940 2 Fig 41 C B A A B E S e r v i c e s...
Страница 111: ...Operation Operating Levers Pedals 93 93 9811 9950 1 796300 B4 Fig 43 A B D E S e r v i c e s...
Страница 132: ...Operation Preparing the Machine for Travel 114 114 9811 9950 1 732010 7 Fig 54 150mm 6in E S e r v i c e s...
Страница 141: ...Operation Working with the Machine 123 123 9811 9950 1 731990 2 Fig 55 1 2 3 E S e r v i c e s...
Страница 169: ...Operation Transporting the Machine 151 151 9811 9950 1 800950 3 Fig 67 X B C B C A D C E S e r v i c e s...
Страница 171: ...Operation Transporting the Machine 153 153 9811 9950 1 800990 4 Fig 68 E S e r v i c e s...
Страница 223: ...Routine Maintenance Greasing 205 205 9811 9950 1 Fig 72 ZTS 8 0 4 0 B A A B C C C D D E E F F H H G E S e r v i c e s...
Страница 257: ...Routine Maintenance Fuel System 239 239 9811 9950 1 T015790 2 Fig 93 A E S e r v i c e s...
Страница 266: ...Routine Maintenance Tracks and Running Gear 248 248 9811 9950 1 Fig 98 E S e r v i c e s...
Страница 298: ...Optional Attachments Quickhitch Rockbreaker 280 280 9811 9950 1 Fig 112 H F J K Z V Y E S e r v i c e s...
Страница 302: ...Optional Attachments Quickhitch Rockbreaker 284 284 9811 9950 1 Page left intentionally blank E S e r v i c e s...
Страница 307: ...Specifications Static Dimensions 289 289 9811 9950 1 Static Dimensions Fig 120 B E D F C A E S e r v i c e s...
Страница 320: ...Specifications Vibration 302 302 9811 9950 1 Page left intentionally blank E S e r v i c e s...