![jcb 67C-1 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/jcb/67c-1/67c-1_service-manual_3541248045.webp)
03 - Attachments, Couplings and Load Handling
27 - Bucket
00 - General
03 - 13
9813/3450-2
03 - 13
Figure 8.
F
E
A
D
A
B
C
A
D
A
B
C
A
Tipping lever lynch pin
B
Spacer
C
Pivot pin
D
Dipper pivot lynch pin
E
Spacer
F
Pivot pin
G
Bucket
H
Dipper
Install
1. Use a suitable lifting device to position the bucket
flat on level ground.
2. Reverse the machine while aligning the dipper
end with the bucket tipping lever.
3. Carefully operate the excavator controls to line
up the holes in the dipper and tipping link with the
holes in the bucket.
4. Install the pivot pin. Install the spacer and the
lynch pin.
5. After the dipper pivot pin has been locked in,
install the tipping link pivot pin, spacer and lynch
pin.
Содержание 67C-1
Страница 2: ...9813 3450 2 Notes Find manuals at https best manuals com...
Страница 4: ...Notes 9813 3450 2 Find manuals at https best manuals com...
Страница 8: ...Notes 01 2 9813 3450 2 01 2 Find manuals at https best manuals com...
Страница 24: ...Notes 01 18 9813 3450 2 01 18...
Страница 28: ...01 Machine 33 Cleaning 01 22 9813 3450 2 01 22 33 Cleaning Contents Page No 01 33 00 General 01 23...
Страница 32: ...9813 3450 2 2018 02 07 Acronyms Glossary PMV Pressure Maintenance Valve...
Страница 34: ...Notes 03 2 9813 3450 2 03 2...
Страница 38: ...Notes 03 6 9813 3450 2 03 6...
Страница 51: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com...