![background image](http://html.mh-extra.com/html/jbl/vtx-series/vtx-series_rigging-manual_638236054.webp)
54
VTX A
8
| Rigging Manual
STEPS:
• Raise the suspended cluster of A8 and B18 cabinets, then align the cart of A8s on the ground underneath the suspended
cluster.
• Once the clusters are aligned, carefully lower the suspended cluster until the front attachment points are nearly touching.
Check that the attachment points are aligned, then lower the suspended cluster until the front attachment points join. Insert
the two front quick release pins.
• With the front QRPs set, use the electric hoist to raise the array. Be aware that the lower cluster may swing forward slightly
as it lifts off the ground. Once the array is off the ground, grab the lower cluster by the handle at the rear of the VT and gently
pull back towards the rear of the array. While doing this, lower the array so that the front wheels of the VT touch the ground.
Continue lowering the array until the rear attachment points engage. Insert the two rear QRPs.
• With all four QRPs secured, lift the array off the ground and remove the VT.
1
2
3
4
Содержание VTX Series
Страница 1: ...VTX SERIES A8 Rigging Manual ...
Страница 28: ...28 VTX A8 Rigging Manual 2 286 mm 90 in 2 434 mm 96 in 7 8 TRUCK PACKING 813 mm 32 in 457 mm 18 in ...
Страница 49: ...49 VTX A8 Rigging Manual 10 4 REPEA T STEPS TO DISASSEMBLE THE ARRA Y ...
Страница 76: ...76 VTX A8 Rigging Manual 14 6 GROUND ST ACK EXAMPLES VTX A8 BP VTX B28 VTX B28 GND VTX A8 ...
Страница 86: ...VTX A8 Rigging Manual ...