Footing:
NOTE: Before digging, call to locate any buried utility lines.
a.
Dig a hole 54" deep x 36" across. The edge of the hole should be flush with the
edge of the playing surface. If you live in an area where heavy frost can occur, it
may pose a problem, consult your local building inspector to determine the
appropriate hole depth.
NOTE: The hole must be at least 54
"
deep.
b.
There must be at least 3 feet of clearance behind the unit to enable the user to
adjust the height.
c.
Mix the concrete according to the instructions on the bags. Note that a thicker mix
of concrete will dry stronger than a thin mix. Pour the concrete into the hole,
stopping approximately 18 inches from the top of the hole.
d.
Insert the basketball post 48 inches deep.
e.
Insert the four pieces of 3/4” x 42” Rebar into the hole, pushing each piece firmly
to the bottom of the hole. The four pieces should be arranged in a square
approximately 8 - 9 inches wide so that each piece of rebar will be positioned
surrounding the backstop post.
f.
Finish filling the hole to the top with concrete.
g.
Allow the concrete to cure a minimum of 72 hours before proceeding. In humid
climates or wet weather, allow additional time for the concert to cure.