Jaypro Sports FBGP-600 Series Скачать руководство пользователя страница 1

SIDE VIEW

FRONT VIEW

EFFECTIVE DATE:

DRAWN BY:

5/25/2017

MODEL NUMBER:

CHECKED BY:

PRODUCT NAME:

Moune  T.

FBGP-600

OFFICIAL 5FT OFFSET FOOTBALL

GOAL POST w/ LEVELING PLATE

WVB

FBGP-600

FOOTBALL GOAL

SPECIFICATIONS

23'-4" INSIDE

HIGH SCHOOL

(REF)

 

18'-6" INSIDE

COLLEGE

(REF)

20'-0"

UPRIGHTS

10'-0"

TO CROSSBAR

30'-3"

OVERALL

HEIGHT

2 3/8" x 3/8" WALL

ALUMINUM UPRIGHTS

4 1/2" x 23'-4" HIGH SCHOOL

4 1/2" x 18'-6" COLLEGE

GALVANIZED STEEL CROSSBAR

GALVANIZED STEEL

GOOSENECK

PLAYING SURFACE

60"

OFFSET FROM

EDGE OF UPRIGHT

TO

OUTSIDE EDGE OF

CROSSBAR

Содержание FBGP-600 Series

Страница 1: ... PLATE WVB FBGP 600 FOOTBALL GOAL SPECIFICATIONS 23 4 INSIDE HIGH SCHOOL REF 18 6 INSIDE COLLEGE REF 20 0 UPRIGHTS 10 0 TO CROSSBAR 30 3 OVERALL HEIGHT 2 3 8 x 3 8 WALL ALUMINUM UPRIGHTS 4 1 2 x 23 4 HIGH SCHOOL 4 1 2 x 18 6 COLLEGE GALVANIZED STEEL CROSSBAR GALVANIZED STEEL GOOSENECK PLAYING SURFACE 60 OFFSET FROM EDGE OF UPRIGHT TO OUTSIDE EDGE OF CROSSBAR ...

Страница 2: ...should be even with the field side inside edge of the end line such that the crossbars measure 360 ft apart inside to inside The distance from the end line to centerline of the bottom upright gooseneck is approximately 62 1 4 for the FBGP 600 series See Figure 1 2 The footing depth is 5 8 Concrete should be a minimum 4000 psi mix For installation see Figure 2 3 The crossbar should be level and at ...

Страница 3: ...d square 3 Let the foundation cure for a minimum of 48 hrs GOOSENECK INSTALLATION 1 Once the footing is complete and the concrete has set for 48 hours rig the gooseneck onto the anchor bolts as shown in Figure 2 2 Adjust the height and plum the gooseneck Secure all hardware Note Due to the weight of the crossbar and uprights the gooseneck will deflect downward 1 to 1 1 2 3 All 7 8 9 nuts and bolts...

Страница 4: ...d line Once the crossbar is level mark by using a center punch and drill the holes through the gooseneck Start with a 3 16 bit then a 3 8 bit and finally a bit Mark and Drill Crossbar Once the holes are drilled use the bolts with two flat washers and thin lock nut Use a Silicon sealant used on each side of the bolt to prevent corrosion ...

Страница 5: ... front to back and side to side Mark the holes using a center punch IMPORTANT It is important that the holes in the end fitting be properly placed to ensure that the end fittings are square and the uprights are parallel to each other Remove the end fitting and drill the marked holes Start with a 3 16 bit then a 3 8 bit and finally a bit PLUM BEFORE DRILLING ...

Страница 6: ...ch top upright cap Install wind streamers if purchased by drilling a 5 16 diameter in the tip of the cap Assemble wind streamers as shown below Tap the cap in place and drill a 3 16 through the hole on the cap to the top upright Use the rivet 3 16 provided and secure the cap PLUM BEFORE DRILLING Close S Hook Ends Fully NOTE Do Not Over Tighten Streamer Must Spin Freely ...

Страница 7: ...e insert on the end Fitting Install the 3 8 hardware through the upright and predrilled hole in end fitting insert Plum the upright and drill the lower hole and install 3 8 hardware PLUM BEFORE DRILLING LOWER HOLE PLUM BEFORE DRILLING LOWER HOLE ...

Страница 8: ...fter both goalposts are installed use yellow rustoluem to paint all of the bolt heads and all of the nuts This will give the fasteners an extra layer of protection and it will give the goalpost a finished look and also touch up any scratches ...

Страница 9: ...WVB GOAL POST GOOSENECK TYP 2 FBGP 600 FOOTBALL GOAL FOOTING SPECIFICATIONS 360 0 INSIDE EDGE OF GOAL POST TO INSIDE EDGE OF GOAL POST 62 1 4 FBGP 600 CENTER OF GOOSENECK UPRIGHT NOTE 1 FRONT EDGE OF GOAL POST CROSSBAR IS TO LINE UP WITH INSIDE EDGE OF ENDLINE 2 CENER OF GOOSENECK UPRIGHT IS TO BE 62 1 4 FROM INSIDE EDGE OF ENDLINE INSIDE EDGE OF ENDZONE SEE NOTE ...

Страница 10: ...INSTALLATION 121 62 1 4 OFFSET FROM CENTER OF UPRIGHT TO INSIDE EDGE OF END ZONE END LINE FIELD SIDE ASSUMES APPROXIMATELY 1 DEFLECTION AFTER INSTALLATION OF CROSSBAR AND UPRIGHTS 8 60 36 12 TYP TYPICAL RE BAR FOOTING DETAILS 1 CHECK LOCAL BUILDING CODES BEFORE STARTING THE FOOTING AS BUILDING CODES MAY VARY LOCAL BUILDING CODES SHOULD BE ADHERED TO IF REQUIREMENTS ARE GREATER THAN THOSE OUTLINED ...

Страница 11: ...T WASHER HW2044 4 8 Bolt 3 8 16x2 HS1616 5 8 3 8 16 LOCK NUT HN1230 6 8 3 8 FLAT WASHER HW2047 7 EFFECTIVE DATE DRAWN BY 5 25 2017 MODEL NUMBER CHECKED BY PRODUCT NAME Moune T FBGP 600 OFFICIAL 5FT OFFSET FOOTBALL GOAL POST w LEVELING PLATE WVB 2 4 3 4 3 4 1 4 6 7 7 5 FBGP 600 FOOTBALL GOAL ASSEMBLY PARTS LIST CROSSBAR GOOSENECK END FITTING ...

Отзывы: