• The boiler must be kept upright during the transportation, installation and use.
• It must be installed on a solid, non-combustible floor out of rain or other water spray 
• Reserve installation and operating space around the boiler
• All the pipe connections and couplings must be copper, brass or iron
• Do not use any plastic fittings or pipes with this boiler
• Install isolating valves to all pipework for easier boiler service
• Boiler maximum running pressure is 1.5 bar, observe this during the installation and operation
• Before comissioning, make sure the boiler is full of water and there are no leaks
• Use smoke pellets to test the flue before first use
• Inhibitor must be added to the boiler / thermal store water
• Make sure the boiler room has adequate air replacement vent installed. This must be at least the
  size of the flue diameter.

The YPV40 must always be connected to a thermal store. The recommended store size is
1800 - 3000 litres.
The flow between the boiler and thermal store must be pumped and the return water to the boiler
must be kept above 65°C. We recommnd the use of a Termovar, Vexve ACG or Vexve ACGE heat

In open vented systems the header tank must be heat resistant and have a minimum capacity of 10% 

is 7-10% of the total water volume ( Thermal store + radiator / UFH network).

of the total water volume in the heating system.

The location of boiler couplings are shown on page 3. YPV40 boiler does not require electrical power

loading unit. Please refer to the drawing on page 5.

to work but the heat transfer pump will need a 5A 230VAC fused supply.

The highest point of the boiler pipework must be fitted with an automatic airing valve. If the system
is open vented, pipework must allow expansion from the boiler and the route for the air to escape
from the boiler.
Under no circumstances should the boiler be used whilst not fully filled with water.

A mechanical boiler cooling valve must be fitted to the indirect cooling coil at the rear of the boiler.
This can for example be a Jaspi TSK / STS valve shown here;

YPV40 must be fitted with a 1.5 - 2.5 bar pressure relief valve and an expansion vessel which capacity

1. GENERAL INSTALLATION INSTRUCTIONS

2. BOILER INSTALLATION

4

Содержание YPV 40

Страница 1: ...INSTALLATION AND OPERATION MANUAL JASPI KNOWS HEATING YPV 40 SOLID FUEL BOILER...

Страница 2: ...2 The insurance certificate pertains to JASPI DUO TRIPLEX ECOWOOD YPV 40 and VPK Raisio 25 4 2003 Kimmo Virtanen Quality Controller Manufacturer K KA AU UK KO OR RA A O OY Y FINLAND 2 hand filled sol...

Страница 3: ...eaning hatch 6 Filling hatch 7 Burning chamber hatch 8 Primary air hatch 9 Thermostat coupling 10 Drain coupling 11 Flow to the thermal store 2 12 Return from the thermal store 2 13 Airing point expan...

Страница 4: ...ed and the return water to the boiler must be kept above 65 C We recommnd the use of a Termovar Vexve ACG or Vexve ACGE heat In open vented systems the header tank must be heat resistant and have a mi...

Страница 5: ...ThermoStore YPV40 SOLID FUEL BOILER Automatic air vent 1 coupling 1 coupling at the bottom of the tank Flow from the boiler 2 coupling on the top of the boiler Boiler return 2 coupling at the rear of...

Страница 6: ...astic parts jubilee clip to the exposed part of the flue a actual flue pipe not the outer shield of the twin wall flue pipe There is no need to insulate the thermostat probe Probe maximum temperature...

Страница 7: ...sure The flue has been smoke tested The boiler is full of water and the pressure is between 0 5 1 3bar The heat transfer pump is working and all the isolating valves are open There are no leaks and th...

Страница 8: ...RYDAY USE Light the paper and make sure the primary air hatch 8 is open To add logs Open the filling hatch 6 and pull the flame diverter plate 16 towards you Use the supplied long metal scraper for th...

Отзывы: