background image

INSTALLATION AND  

OPERATION MANUAL

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

JASPI KNOWS HEATING

YPV 40

SOLID FUEL BOILER

Содержание YPV 40

Страница 1: ...INSTALLATION AND OPERATION MANUAL JASPI KNOWS HEATING YPV 40 SOLID FUEL BOILER...

Страница 2: ...2 The insurance certificate pertains to JASPI DUO TRIPLEX ECOWOOD YPV 40 and VPK Raisio 25 4 2003 Kimmo Virtanen Quality Controller Manufacturer K KA AU UK KO OR RA A O OY Y FINLAND 2 hand filled sol...

Страница 3: ...eaning hatch 6 Filling hatch 7 Burning chamber hatch 8 Primary air hatch 9 Thermostat coupling 10 Drain coupling 11 Flow to the thermal store 2 12 Return from the thermal store 2 13 Airing point expan...

Страница 4: ...ed and the return water to the boiler must be kept above 65 C We recommnd the use of a Termovar Vexve ACG or Vexve ACGE heat In open vented systems the header tank must be heat resistant and have a mi...

Страница 5: ...ThermoStore YPV40 SOLID FUEL BOILER Automatic air vent 1 coupling 1 coupling at the bottom of the tank Flow from the boiler 2 coupling on the top of the boiler Boiler return 2 coupling at the rear of...

Страница 6: ...astic parts jubilee clip to the exposed part of the flue a actual flue pipe not the outer shield of the twin wall flue pipe There is no need to insulate the thermostat probe Probe maximum temperature...

Страница 7: ...sure The flue has been smoke tested The boiler is full of water and the pressure is between 0 5 1 3bar The heat transfer pump is working and all the isolating valves are open There are no leaks and th...

Страница 8: ...RYDAY USE Light the paper and make sure the primary air hatch 8 is open To add logs Open the filling hatch 6 and pull the flame diverter plate 16 towards you Use the supplied long metal scraper for th...

Отзывы: