background image

16 

 

EY Assurance Certificate 

 

 

www.kaukora.fi

 

 

certifies that its solid-fuel heating boiler 

         

 

complies with the pressure vessels requirements according to  

the Ministry of Finance and Industry's Decision 938/1999 and Directive 97/23/EY 

Modules B1 

Quality audit agency 

 

Declared agency 0424 

Inspecta EY inspection certificate for the development of RS 419-07 

Testing has been conducted to EN 303-5, test agency 

 

SP Sveriges Tekniska Forskningsinstitut, declared agency 1002 

Inspection report P7 00360-02 

Applicable compliance standards: 

EN 303-5 

Applicable directives: 

PED Directive (97/23/EY § 3.3) 

EMC Directive (89/336/EEC, 92/31/EEC, and 93/68/EEC) 

LVD Directive (73/23/EEC and 93/68/EEC) 

Raisio 30.01.09 

 

Kimmo Virtanen

 

Содержание Econature40

Страница 1: ...07 2011 SOLID FUEL BOILER INSTALLATION AND OPERATION MANUAL J SPI HEATING PROFESSIONAL www kaukora fi...

Страница 2: ...t Connection Diagram 8 Boiler Operation and Maintenance 8 Fuel 8 Start up 9 Control Panel 9 Firewood burning 10 Combustion Air Control 11 Maintenance 12 Cleaning 13 Troubleshooting 13 The boiler water...

Страница 3: ...ns at a temperature above 100 C when the temperature exceeds 280 C the resulting reaction causes heat re lease Secondary combustion the reaction between pyrolytic gases and oxygen begins at a temperat...

Страница 4: ...ax temperature 110 C Min temperature 0 C Max pressure 3 0 bar Standard pressure 1 5 bar Proof test pressure 4 0 bar Power consumption 0 12 kW Voltage 230 V Frequency 50 Hz Body protection IP 2X Furnac...

Страница 5: ...accumulator 10 R15 FH drain connection 11 R25 FH expansion connection 12 R15 FH flue gas sensor analyzer connec tion 13 Sensor panel 14 Flame monitor glass 15 Upper primary air adjusting damper 16 Low...

Страница 6: ...extractor fan motor is changed Correct rota tion direction is marked on the flue swivelling joint with an arrow Boiler Room Leave free space of at least 1000 m in front of the filling and maintenance...

Страница 7: ...r three maximum valves if necessary To confirm functionality at least two safety relief valves are recom mended to be used at all times each having the required blowoff capacity The blowoff line of th...

Страница 8: ...ora tion and remove most of it through the stack as unburnt flue gases thus uselessly loosing part of energy and resulting in soot formation in the stack Firewood is considered dry when the moisture c...

Страница 9: ...pera ture in the boiler 3 Pump thermostat 60 90 C Activates the charging pump when the boiler water achieves the setpoint The setpoint should be at least 85 C under normal operating conditions 4 Smoke...

Страница 10: ...ard onto the bar so that the blocks touch the rear wall of the furnace Set the smoke exhauster thermostat to the setpoint which is about 90 C The set point is correct if the smoke exhauster stops when...

Страница 11: ...and ratio for burning varies depending on the wood to be burnt Primary and secondary air is factory adjusted for birch firewood Upper primary air does not have to be ad justed under normal operating c...

Страница 12: ...tains air oxygen The hot system pressure should be lower than 1 5 bar and the cold system pressure higher than 0 5 bar 1 5 bar safety relief The water volume varies as the tempera ture i e the higher...

Страница 13: ...boiler water temperature does not rise to the desired level Ensure that the primary and secondary air ratio and access are correct Ensure that the firewood is dry If there is a cooling coil in the boi...

Страница 14: ...that the thermostat indi cator lamp is on since the set value of the extractor thermostat is 90 C Check the set value of the flue gas ther mostat Check that the temperature limiter has not tripped For...

Страница 15: ...170 C Reduced flue pressure Pump speed Pump speed Upper primary air 0 Lower primary air 0 Secondary air 0 Expansion tank pre pressure Signature Warranty The warranty is confirmed to be two years for t...

Страница 16: ...dit agency Declared agency 0424 Inspecta EY inspection certificate for the development of RS 419 07 Testing has been conducted to EN 303 5 test agency SP Sveriges Tekniska Forskningsinstitut declared...

Отзывы: