Jason International, Inc. •
501.771.4477
Page 6 of 15
Customer Service : 800.255.5766
Figure 10
12.Complete the installation of the drain and overflow per the
instructions included with the drain and overflow.
13.It is recommended that the bath be water tested (filled and
operated) and the bath be inspected for leaks. Refer to
the
Filling and Draining
section on page 10.
14.Seal the joint between the skirt bottom and the floor with
a silicone caulk.
(See Figure 10.)
15.
After installation, remove all loose debris both inside the
bathwell and around the blower. Construction plaster or
excess grout can be removed with the use of a wood (edge)
trowel. Paint or tar stains may need to be removed with
a cleaner such as paint thinner, turpentine, or isopropyl
alcohol (rubbing alcohol). Never allow the cleaner to soak
against the surface for long periods of time. Always rinse
the surface immediately following the use of cleaners.
NOTe:
Follow the manufacturers instructions for safely
using these or similar products. If the surface becomes
scratched or dulled, it may be restored by using a quality
plastic polish, i.e., Novus Plastic Polish No. 2. It is always
preferable to protect the acrylic surface during installation
to minimize cleanup and prevent surface damage
.
See the USER MAINTENANCE INSTRUCTIONS on page 13 for humidity
and mold prevention suggestions prior to Installation.
INSTALLATION INSTRUCTIONS (cont.)
Figure 8
Figure 9