Page 11
3.2.3 Bonding the Power Center
Install a bonding lug to the Power Center
enclosure. Connect the bond lug, using a #8 solid
copper core wire, to an approved earth ground (an
approved ground stake, grid, or conducting metal
water pipe buried to a sufficient depth). See
Figure 3.
3.2.2 3HP (Standard) Relays
For each piece of
240 volt
equipment to be
controlled,
connect line power to the two (2) line
terminals
and
connect equipment power to the two
(2) load terminals
on the same relay.
For each piece of
120 volt
equipment,
connect
power to a line terminal
and
connect equipment to
a load terminal
on the same relay.
NOTE
The following are the contact ratings for HP
(Standard) Relay. DO NOT exceed any ratings.
HP @ 20 VAC; 1½ HP @ 120 VAC; 25
Amps; 1500 Watts.
Figure 3. Standard Power Center - Bonding
Filter Pump Relay
Aux. 3 Relay
Load
2
Line
2
Load
1
Line
1
Ground
Neutral
Bonding lug
Earth
Ground
Breaker
Panel
Blower
(120 VAC)
Filter Pump
(240 VAC)
Primary
24 V
AC
Transformer
Содержание AquaLink RS PDA
Страница 2: ......
Страница 33: ...Page 33 NOTES...
Страница 34: ...Page 34 NOTES...
Страница 35: ......