Issue: 01.05.2017
Page 19
Commissioning
Switch Unit On/Off (By Controller)
1.
With
controller Home screen displayed, Press PRG button to go Main Menu screen and select “A. On/Off Unit”
2.
Press ENTER button. Screen A01 is displayed.
3.
Press ENTER button to move cursor from home position to SWITCH OFF value. Switch Unit ON by using
UP/DOWN arrows. Press ENTER button to confirm.
4.
Press ESC button repeatedly to return to Home Screen. This should now show ON by KEY at the bottom of the
screen.
5.
The unit will start up following a short delay (assuming all conditions for compressor start-up are met).
Содержание JEHSD-0600-M-3
Страница 27: ...Issue 01 05 2017 Page 27 Drawings Dimensional drawing JEHSD 0600 M 3 ...
Страница 28: ...Issue 01 05 2017 Page 28 Drawings Electrical Wiring Diagram JEHSD 0600 M 3 ...
Страница 34: ...Issue 01 05 2017 Page 34 Technical Information Medium Version Controller ...
Страница 36: ...Issue 01 05 2017 Page 36 Certification ...
Страница 37: ...Issue 01 05 2017 Page 37 Certification ...
Страница 38: ...Issue 01 05 2017 Page 38 Certification ...
Страница 39: ...Issue 01 05 2017 Page 39 THIS PAGE IS LEFT BLANK INTENTIONALLY ...