Section C
Control Panel.
1. Start-Up Procedure.
i. On completion of the Installation of all Leader / Detecting &
Jumper cables, the following procedure should be used to Start-Up
the system :-
ii Ensure that all the cables are connected together and that the
End of Line resistive plug (EOL-2) has been connected at the end of
the last length of cable installed & that they have been tested as
described in
Section ‘B’
.
iii. Connect the Leader cable (LS-LC) to the Control Panel Terminals
marked
‘CD-x’
via a suitable cable entry gland.
iv.
Cause a competent qualified person to connect the Battery
Back-Up leads to the correct terminals of the sealed Lead Acid
Batteries and the Control Panel to the Mains Power supply as
described in Section ‘A’.
(See also page 15, Control Panel Terminals.)
v.
Close & Lock the Control Panel door & Switch on the Mains
Power supply.
vi. The Control Panel will Automatically recognise the characteristics
& length of the cables connected to the system.
vii. The LCD screen will now DISPLAY the following:-
viii. The
Heart
will pulse to show that the Power Supply is connected.
- 5 -
aqualarm
Environmental Monitoring System
SET
TIME
TIME
DATE
SYSTEM CLEAR
VIEW
LOGS
SHOW
CABLE
TEST
Screen ‘A’