page: 13 / 20
●
Install roof. To do this, install in peak profiles 11 D in places as shown on the drawing. Visor shaped
sheet screwed "overlap" the special screws (farm ) to profiles 11 and 11D .
3.8.5. Screw the crossbars to the trolleys; check operation of awning
CAUTION!
For correct operation of the awning, it is necessary that the side profiles are perfectly
parallel to each other, and the connection between the front profile and trolley are
sliding on one side as described below. Otherwise, it may result in incorrect operation
of the awning and damage.
●
Place the cross crossbars (16) of the fabric under construction with pergola.
●
Pick up and put on a pedestal mounting the above-mentioned set, so that the distance between
guide and the platform was approx. 60 - 70 cm.