Go-X Series Rolling Shutter GigE Vision I/F (Preliminary)
17
Step 3: Verifying Camera Operation
When power is supplied to the camera while the necessary equipment is connected, the
POWER/TRIG LED at the rear of the camera lights amber, and initialization of the camera starts.
When initialization is complete, the POWER/TRIG LED lights green.
Verify whether power is being supplied to the camera by checking the rear LED.
* For details on how to read the LEDs, see “
” in the “Parts
Identification” section.
Step 4: Verifying the Connection between the Camera and PC
Verify whether the camera is properly recognized via Control Tool.
Connecting the Camera to Control Tool
1
Startup eBUS Player for JAI
eBUS Player for JAI
eBUS Player for JAI startup screen appears.
When properly turned on
Lit green
Содержание GOX-6409M-PGE
Страница 72: ...Go X Series Rolling Shutter GigE Vision I F Preliminary 72 Spectral Response GOX 6409MC PGE...
Страница 73: ...Go X Series Rolling Shutter GigE Vision I F Preliminary 73 Spectral Response GOX 12409MC PGE...
Страница 74: ...Go X Series Rolling Shutter GigE Vision I F Preliminary 74 Spectral Response GOX 20409MC PGE...
Страница 75: ...Go X Series Rolling Shutter GigE Vision I F Preliminary 75 Dimensions...