100
B. HYDRAULIC CONNECTION ON THE OUTSIDE, ELECTRICAL CONNECTION ON THE INSIDE
Hydraulic connection: 2-pipe connection with connection points
Overview connection points
Connect the pipes to the connectionpoints. Take the above diagram into account in order to ensure
correct operation.
Top: supply
Bottom: return
Connect the pipes to the connectionpoints. Take the above diagram into account in order to ensure
correct operation.
Top:
cold water
: supply and return
Bottom:
hot water
: supply and return
Hydraulic connection: 4-pipe connection with connection points
Overview connection points
Содержание Clima Quatro Canal H19
Страница 2: ...NL PG 3 PG 29 PG 55 PG 81 FR DE EN 2...
Страница 3: ...INSTALLATIEHANDLEIDING Clima Quatro Canal H19 3...
Страница 29: ...INSTRUCTION D INSTALLATION Clima Quatro Canal H19 29 29...
Страница 55: ...INSTALLATIONHINWEIS Clima Quatro Canal H19 55...
Страница 81: ...INSTALLATION INSTRUCTIONS Clima Quatro Canal H19 81...
Страница 107: ...107 EN NOTES...