FIXED PANEL
BOTTOM RAIL
LAY A 1/4" BEAD OF
SEALANT UNDER THE
FIXED PANEL
TWO
SCREWS
15
°
ILLUSTRATION 14
ILLUSTRATION 12
ILLUSTRATION 13
S
R
15
°
1/8"
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
DOOR GUIDE AREA.
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
SIDE OF RAIL.
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
S
FIXED PANEL TO BOTTOM RAIL
DRILLING FIXED PANEL
DRILLING FIXED PANEL
DOOR GUIDE
AREA
OU
TS
IDE
M4.2X19MM
STAINLESS STEEL
SCREW
QTY.-2
R
10. Locate the bottom rail and the fixed panel. Lay a
bead of sealant on the bottom of the fixed panel.
Secure the bottom rail to the fixed panel. (See
Illustration 12.) Drill a 3/32" diameter hole into the
bottom rail at a 15
°
angle. Drill only through the first
aluminum thickness. (See Illustration 13.) Secure
the front of the fixed panel to the bottom rail. (See
Illustration 14.) Clean off excess sealant.
13
Содержание Verona
Страница 1: ...WHIRLPOOL BATH R INSTALLATION AND OPERATING MANUAL J CORNER SHOWER TOWER ENCLOSURE Verona...
Страница 2: ......
Страница 22: ......
Страница 23: ......