manualshive.com logo in svg
background image

Page 6 

www.jacuzzi.com

 

Installation

English

Framing and Support (cont.)

Subfloor

Prepare the subfloor for the drain and ensure that the area is level.

1.  The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical 

Specifications Manual that corresponds with your bathtub.

2.  Make appropriate cuts to the subfloor to accommodate the drain.

3.  The Jacuzzi Tru-Level® base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface, no 

other preparation is necessary. Proceed to the “Electrical Connections” section.

4.  If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used will 

insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or 

minimal expansion structural foam (having a density of a minimum 5 lbs/cubic foot). The bathtub must remain level in 

order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of subfloor 

should be level to each other.

Electrical Connections

  DANGER

: RISK OF ELECTRIC SHOCK!

 Connect only to a 

circuit protected by a GFCI (Figure 3).

  

CAUTION!

 

Electrical outlet must be mounted 4" (101 mm) above the floor 

line and 12" max (305 mm) inside from the edge of the bathtub (Figure 3), or in 

accordance with local building and electrical codes.

  

CAUTION!

 

Risk of component overheat. Do not use electric extension 

cord to power this unit. Operating the pump without enough water in the bathtub 

can cause permanent damage to the pump/motor.

If the GFCI unit indicates a malfunction, per manufacturer’s instructions, turn 

OFF power and do not attempt to use the bathtub until the source of the problem 

has been identified and corrected.

NOTES:

 When using electrical products, basic precautions should always be 

followed. Always follow local building and electrical codes. Grounding is required. 

The unit should be installed and grounded by a qualified electrician.

CANADIAN MODELS ONLY: 

The components must be hard wired in the  

J-Boxes (supplied) that are located on the unit.

See Technical Specifications Manual for electrical requirements.

Shown: Pure Air® 

Bath

4˝ 

(101 mm)

12˝ 

(305 mm)

Fig. 3

4˝ 

(101 mm)

12˝ 

(305 mm)

Shown: Whirlpool w/

optional heater

Содержание Luxury Bath

Страница 1: ...INSTALLATION INSTRUCTIONS LG32000 08 2015 Jacuzzi Luxury Bath 14525 Monte Vista Avenue Chino CA 91710 1 800 288 4002 www jacuzzi com...

Страница 2: ...meowner Homeowner Read this manual and keep for future reference Product Information 2 Important Safety Instructions 3 Inspection and Testing 4 Framing and Support 5 Electrical Connections 6 Chromathe...

Страница 3: ...OUND or GROUNDING is provided within the terminal compartment To reduce the risk of electric shock connect the terminal or connector to the grounding terminal of your electric service or supply panel...

Страница 4: ...the product has been made Do not lift the bathtub by the plumbing at any time handle by the shell only 2 Inspect the shell and bathtub components Should inspection reveal any damage or defect in the f...

Страница 5: ...ons use an integral molded three sided tiling flange bathtub When using the optional tile flange refer to instructions that are included with kit In remodeling if necessary add studs at each end to pr...

Страница 6: ...t or splice of subfloor should be level to each other Electrical Connections DANGER RISK OF ELECTRIC SHOCK Connect only to a circuit protected by a GFCI Figure 3 CAUTION Electrical outlet must be moun...

Страница 7: ...be installed by a qualified plumber See special notes on freestanding section for faucetry Proper installation of the spout plumbing and compliance with local codes are the responsibility of the in st...

Страница 8: ...If undermounting is an option be careful to select the guide lines that apply to the installation that you are performing 2 Complete all deck finish work and cover to protect from damaging while placi...

Страница 9: ...dimensions square and plumb check floor for levelness Figure 10 Rough in should be kept to a minimum until the unit is on the job site Measurements may vary 0 or from original specifications 2 Place t...

Страница 10: ...with applicable codes and generally accepted building practices 9 Turn on the power supply to the dedicated GFCI protected circuits and check system operation 10 Caulk around the perimeter of bathtub...

Страница 11: ...the above locations have been marked on the floor remove the tub base skirt set it aside and continue with the installation process 4 Faucetry is not supplied with the freestanding bath To use deck mo...

Страница 12: ...nce the whirlpool action intensifies the foaming properties of soaps The use of certain bathtub oils bubble baths and bathtub additives may increase the level of accumulations of bathtub residue in th...

Страница 13: ...of the bathtub near the pump motor SPECIFICATION SERIAL NUMBER LABEL PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE USE TECHNICAL SPECIFICATIONS MANUAL SUPPLIED WITH PRODUCT Jacuzzi Luxur...

Страница 14: ...e caused by the common carrier installer user or other per sons pets or rodents or resulting from without limitation any of the following careless handling lifting unit by plumbing abrading finish etc...

Страница 15: ...ny replacement parts for the Options and Accessories Any replacement parts shall be covered by the original equipment manufacturer The Distributor or Dealer is responsible for knowing local code requi...

Страница 16: ...Jacuzzi Luxury Bath 14525 Monte Vista Avenue Chino California 91710...

Страница 17: ...y Installed 3 What was the main reason for purchase Styling Warranty Service Product Features Brand Name Price Hydrotherapy Home Resale________________________ Other______________________________ 4 Wh...

Страница 18: ......

Страница 19: ......

Страница 20: ......

Отзывы: