Installation

English

Framing and Support

READ ALL INSTALLATION INSTRUCTIONS COMPLETELY. IMPROPER INSTALLATION WILL VOID THE WARRANTY.

The floor structure beneath the bathtub must be able to support the total weight of the bathtub, water and bather. Consult 

a structural engineer.

IMPORTANT!

Make sure that walls and floors meet fire safety requirements of local building code and/or FHA/HUD Minimum Property 

Standards.

Observe all governing codes and ordinances.

1.  Proper installation is your responsibility. Have a qualified technician install this bath.

2.  Installation using a ground-fault circuit-interrupter (GFCI) is required.

3.  It is the customer’s responsibility: 

• To contact a qualified electrical installer.

 

• To assure that electrical installation is adequate and in 

conformance with National Electrical Code (NEC).

A Technical Specifications Manual has been included with your bath

-

tub. It contains pertinent information regarding your Jacuzzi® product. 

Locate the Technical Specifications Manual at this time.

Frame out the space where the bathtub is to be located. The following 

should be taken into consideration when preparing the area:

•  Dimensions provided on rough-in diagrams are nominal. Measure 

your actual unit upon receipt and build according to the actual 

dimensions.

•  Finished alcove must have correct interior dimensions, as shown 

in the key dimension section in the Technical Specifications 

Manual, to properly install unit.

•  For three wall alcove installations, use an integral molded three-

sided tiling flange bathtub. When using the optional tile flange, 

refer to instructions that are included with kit.

•  In remodeling, if necessary, add studs at each end to provide a 

vertical nailing surface for the side nailing flanges of bath fixture 

product.

•  To avoid obstructions during installation make sure that supply 

lines, spout pipe and valve plumbing do not project into alcove.

• 

Bathtubs require a 6" x 12" (150 mm x 305 mm) floor opening for 

the 1 ½" (38 mm) drain, waste and overflow (DWO) kit.

• 

Be sure floor opening location matches bathtub fixture drain location.

•  Use of casting plaster/plaster of paris (foundation material) is recommended 

in all commercial structures (i.e. hotels, motels, dormitories, health clubs, 

etc.).

•  The unit must be supported from the bottom of the bathtub and not from the 

bathtub rim.

• 

Per UPC code, access must be provided to the pump/motor for your specific model (Figure 1 and Figure 2).

• 

Provide adequate ventilation for cooling and supply sufficient air for the pump/motor. Do not insulate around the 

equipment.

•  It is the responsibility of the installer, building contractor or owner to provide access for service. Jacuzzi is not respon-

sible for any costs relating to obtaining access for repair. The owner shall bear such costs and, if appropriate, must 

seek recovery from the installer.

Blower or 

Pump Motor

Access 

location

example

Access 

location

example

A

B

Fig. 1

 

Blower or 

Pump Motor

Access 

Location 

Examples

Access 

Location 

Examples

A

B

Fig. 2

A

 = Primary access (required)

B

 = Secondary access for equipment (optional)

Illustrations above shown with framing exposed 
for clarity.

IMPORTANT:

 Left hand unit access is on the 

opposite side (mirror)

Содержание Luxury Bath

Страница 1: ...INSTALLATION INSTRUCTIONS LG32000 08 2015 Jacuzzi Luxury Bath 14525 Monte Vista Avenue Chino CA 91710 1 800 288 4002 www jacuzzi com...

Страница 2: ...meowner Homeowner Read this manual and keep for future reference Product Information 2 Important Safety Instructions 3 Inspection and Testing 4 Framing and Support 5 Electrical Connections 6 Chromathe...

Страница 3: ...OUND or GROUNDING is provided within the terminal compartment To reduce the risk of electric shock connect the terminal or connector to the grounding terminal of your electric service or supply panel...

Страница 4: ...the product has been made Do not lift the bathtub by the plumbing at any time handle by the shell only 2 Inspect the shell and bathtub components Should inspection reveal any damage or defect in the f...

Страница 5: ...ons use an integral molded three sided tiling flange bathtub When using the optional tile flange refer to instructions that are included with kit In remodeling if necessary add studs at each end to pr...

Страница 6: ...t or splice of subfloor should be level to each other Electrical Connections DANGER RISK OF ELECTRIC SHOCK Connect only to a circuit protected by a GFCI Figure 3 CAUTION Electrical outlet must be moun...

Страница 7: ...be installed by a qualified plumber See special notes on freestanding section for faucetry Proper installation of the spout plumbing and compliance with local codes are the responsibility of the in st...

Страница 8: ...If undermounting is an option be careful to select the guide lines that apply to the installation that you are performing 2 Complete all deck finish work and cover to protect from damaging while placi...

Страница 9: ...dimensions square and plumb check floor for levelness Figure 10 Rough in should be kept to a minimum until the unit is on the job site Measurements may vary 0 or from original specifications 2 Place t...

Страница 10: ...with applicable codes and generally accepted building practices 9 Turn on the power supply to the dedicated GFCI protected circuits and check system operation 10 Caulk around the perimeter of bathtub...

Страница 11: ...the above locations have been marked on the floor remove the tub base skirt set it aside and continue with the installation process 4 Faucetry is not supplied with the freestanding bath To use deck mo...

Страница 12: ...nce the whirlpool action intensifies the foaming properties of soaps The use of certain bathtub oils bubble baths and bathtub additives may increase the level of accumulations of bathtub residue in th...

Страница 13: ...of the bathtub near the pump motor SPECIFICATION SERIAL NUMBER LABEL PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE USE TECHNICAL SPECIFICATIONS MANUAL SUPPLIED WITH PRODUCT Jacuzzi Luxur...

Страница 14: ...e caused by the common carrier installer user or other per sons pets or rodents or resulting from without limitation any of the following careless handling lifting unit by plumbing abrading finish etc...

Страница 15: ...ny replacement parts for the Options and Accessories Any replacement parts shall be covered by the original equipment manufacturer The Distributor or Dealer is responsible for knowing local code requi...

Страница 16: ...Jacuzzi Luxury Bath 14525 Monte Vista Avenue Chino California 91710...

Страница 17: ...y Installed 3 What was the main reason for purchase Styling Warranty Service Product Features Brand Name Price Hydrotherapy Home Resale________________________ Other______________________________ 4 Wh...

Страница 18: ......

Страница 19: ......

Страница 20: ......

Отзывы: