ILLUSTRATION 20
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
ROLLER TRACK OF
TOP RING.
ILLUSTRATION 22A
BOLT
QTY.-2
W
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
S
DRILLING TOP RING
RING TO BRACKET
ILLUSTRATION 22B
RING TO BRACKET
ILLUSTRATION 21
DRILLING TOP RING
SCREW, HEX
WASHER BOLT
1/4-20X2.5"
BOLT
QTY.-2
W
PAINT OUTSIDE EDGE TO
MATCH BATHROOM FINISH
15
°
1/8"
OUT
SID
E
LOCATED IN HARDWARE PACK
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
ROLLER TRACK.
S
15
°
ROLLER
TRACK
TOP
RING
GROOVE
FIXED
PANEL
16
15. Plumb and square the tower. (See Illustrations 22A and
22B.) Secure the top ring to the wall bracket by inserting
the hex bolts through the wall bracket into the top ring
and tighten (wall bracket is pre-threaded).
14. Drill a 3/32" diameter hole into the top ring at a 15
°
angle. (See Illustration 20.) Engage the top of the fixed
panel with the top ring groove. Secure the top of the
fixed panel to the top ring. (See Illustration 21.)
Содержание J-Corner Shower Tower Verona
Страница 1: ...WHIRLPOOL BATH R INSTALLATION AND OPERATING MANUAL J CORNER SHOWER TOWER ENCLOSURE Verona...
Страница 2: ......
Страница 22: ......
Страница 23: ......