FIXED PANEL
BOTTOM RAIL
LAY A 1/4" BEAD OF
SEALANT UNDER THE
FIXED PANEL
TWO
SCREWS
15
°
ILLUSTRATION 14
ILLUSTRATION 12
ILLUSTRATION 13
S
R
15
°
1/8"
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
DOOR GUIDE AREA.
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
SIDE OF RAIL.
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
S
FIXED PANEL TO BOTTOM RAIL
DRILLING FIXED PANEL
DRILLING FIXED PANEL
DOOR GUIDE
AREA
OU
TS
IDE
M4.2X19MM
STAINLESS STEEL
SCREW
QTY.-2
R
10. Locate the bottom rail and the fixed panel. Lay a
bead of sealant on the bottom of the fixed panel.
Secure the bottom rail to the fixed panel. (See
Illustration 12.) Drill a 3/32" diameter hole into the
bottom rail at a 15
°
angle. Drill only through the first
aluminum thickness. (See Illustration 13.) Secure
the front of the fixed panel to the bottom rail. (See
Illustration 14.) Clean off excess sealant.
13
Содержание J-Corner Shower Tower Verona
Страница 1: ...WHIRLPOOL BATH R INSTALLATION AND OPERATING MANUAL J CORNER SHOWER TOWER ENCLOSURE Verona...
Страница 2: ......
Страница 22: ......
Страница 23: ......