Assembly of the Top Link Frame
Assembly
of
the
Top
Link
Frame
•
Align
the
tank
level
indicator
with
the
2
bolt
holes
for
the
top
link
frame,
on
the
right
side
of
the
sprayer.
Install a flat washer onto the bolts and insert the bolt
Install
a
flat
washer
onto
the
bolts
and
insert
the
bolt
into
the
holes.
Use
another
flat
washer,
lock
washer
and
nut
and
tighten
the
top
link
frame
and
tank
level
indicator
to
the
chassis. Install
the
other
2
bolts,
washers
and
nuts
on
the
left
side
and
tighten.
Tank
Level
Indicator
Left
side
bolts
bolts
7