Assembly of the Top Link Frame
Assembly
of
the
Top
Link
Frame
•
Position
the
top
link
frame
onto
the
sprayer
chassis
as
shown.
While
aligning
the
bolt
holes
insert
the
4
bushing supplied into the side holes This will hold
bushing
supplied
into
the
side
holes.
This
will
hold
the
top
link
frame
in
place
for
the
next
step.
Hardware
d
Required
Top
Link
Frame
Bushings
Installed
6